Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Excavation Of Dharampur Wht Under Block Keshpur, Mouza Dharampur, Jl No. 247, Plot No. 182
|
| Description |
Re Excavation Of Dharampur Wht Under Block Keshpur, Mouza Dharampur, Jl No. 247, Plot No. 182
|
| Organisation | WATER RESOURCES DEV. DTE. | State Govt. and UT |
| Tender Id | 2024_WRDD_792295_1 |
|
Reference Number |
EE(AI)/MID/eNIT-12/24-25ii |
| Tender Fee | 0 |
| EMD | 1.5 Lakh |
| Tender Value | - |
| Place | Paschim Midnapore |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1757691 |
| Start Date | December 31, 2024 14:30 |
| End Date |
Expired
14/01/2025
Expired 639 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Re-excavation of gouribari pond
Re-excavation of gouribari pond at j.l. no. 36, dag no. 89 at chaitali mouza, bankura district
Read moreEauction for plot no 182 as per nit notification
Eauction for plot no 182 as per nit notification
Read moreRe-excavation of rayer bundh wht and installation of solar operated pumping system at mouza- dhabani in block- durgapur-faridpur under damodar (a-i) cad division under core sector program
Re-excavation of rayer bundh wht at mouza- dhabani in block- durgapur-faridpur of dist- paschim burdwan under damodar (a-i) cad division, purba bardhaman under core sector program.
Read moreTender for re-org. of 25 kva, 11/0.4 kv sstn chakyana due to landslide/ landsinking in (e) section dharampur uesd hpsebl dharampur.
Tender for re-org. of 25 kva, 11/0.4 kv sstn chakyana due to landslide/ landsinking in (e) section dharampur uesd hpsebl dharampur.
Read more2433/ms/exp/d-290/853/med store, dept of paed ward (drugs)/ifa re 182/2026-27
2433/ms/exp/d-290/853/med store, dept of paed ward (drugs)/ifa re 182/2026-27 for ahrr
Read moreRe-excavation and development of water detention structure at mouza-jaigir chilakhana, block-tufanganj-i under core-sector programme
Re-excavation and development of water detention structure at mouza-jaigir chilakhana, block-tufanganj-i in the district of coochbehar under coochbehar (ai) division under core-sector programme.
Read moreRe-excavation of 02 (two) number canals at kalahazra mouza, ramchandrakhali gp under basanti block under core sector program
Re-excavation of canal from house of nayep ali laskar to house of mongal roy, mouza- kalahazra, j.l. no.- 139, plot no.- 463, 641, g.p.- ramchandrakhali, block- basanti, district- south 24 parganas under core sector programme.
Read moreRe-excavation of 02 (two) number canals at kalahazra mouza, ramchandrakhali gp under basanti block under core sector program
Re-excavation of canal from house of essar gharami to house of ayenal molla, mouza- kalahazra, j.l. no.- 139, plot no.- 1496, 1601, g.p.- ramchandrakhali, block- basanti district- south 24 parganas under core sector programme
Read moreRe-excavation of canal from house of sushil shaw to kalahazra kheya ghat, at mouza-manashakhali, block- basanti under core sector programme
Re-re-excavation of canal from house of sushil shaw to kalahazra kheya ghat, at mouza- manashakhali, block- basanti, district- south 24 parganas under kolkata (ai) division under core sector programme.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreof your Industry type