Tender Details

Particulars Details
Title
Nctps Ii Civil Maintenance Circle Improvement Work Strengthening Of Rcc Approach Road Including Widening And Raising The Existing Rcc Road At Entrance Of Fly Ash Silo In Eastern Side Of Silo Area At Nctps Ii
Description
Nctps Ii Civil Maintenance Circle Improvement Work Strengthening Of Rcc Approach Road Including Widening And Raising The Existing Rcc Road At Entrance Of Fly Ash Silo In Eastern Side Of Silo Area At Nctps Ii
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_482310_1
Reference
Number
CE/NCTPS-II/SE/CM/ 38/2024-25
Tender Fee 0
EMD 23100
Tender Value
Place NCTPS II
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=573108
Start Date September 09, 2024 23:30
End Date

24/09/2024 ( Expired 230 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Raising height of barvi dam rehabilitation work construction of rcc built-up open gutter along road side of tondali i, tondali ii and manivali i, manivali ii goathan.

Raising height of barvi dam rehabilitation work construction of rcc built-up open gutter along road side of tondali i, tondali ii and manivali i, manivali ii goathan.

Read more
Raising height of barvi dam rehabilitation work construction of rcc built-up open gutter along road side of kachkoli- i,mohghar- i, mohghar- ii and sukalwadi goathan.

Raising height of barvi dam rehabilitation work construction of rcc built-up open gutter along road side of kachkoli- i,mohghar- i, mohghar- ii and sukalwadi goathan.

Read more
Face lifting of existing compound wall, improvement of approach road at the entrance of court campus and other minor repair works inside the district court building, nm andaman at lucknow under sub division no.i, nacd, apwd, mayabunder.sw-repair adj

Face lifting of existing compound wall, improvement of approach road at the entrance of court campus and other minor repair works inside the district court building, nm andaman at lucknow under sub division no.i, nacd, apwd, mayabunder.sw-repair adj

Read more
Construction of rcc retaining wall

Construction of rcc retaining wall at chitahi village for widening / strengthening of village road under jogidih colliery, govindpur area

Read more
Balance work for providing street light arrangement, in connection with upgradation of road network at eastern side of dock basin of haldia dock complex, smpk and comprehensive maintenance of complete arrangement for 05years.

Balance work for providing street light arrangement, in connection with upgradation of road network at eastern side of dock basin of haldia dock complex, smpk and comprehensive maintenance of complete arrangement for 05years.

Read more
Improvement of m i bora road by widening of road side with interlocking concrete block pavement from the junction of tank side road up to jengonikotia chariali at ward no ii and xii of sibsagar municipal board under ncap 2023-2024

Improvement of m i bora road by widening of road side with interlocking concrete block pavement from the junction of tank side road up to jengonikotia chariali at ward no ii and xii of sibsagar municipal board under ncap 2023-2024

Read more
Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: conducting sub soil investigation work for hlb at km 8/2-4)

Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: conducting sub soil investigation work for hlb at km 8/2-4)

Read more
Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: providing consultancy services for conducting topograhical survey and preparation of plan and profile)

Widening and strengthening of 1. r and b pwd road to pagidimarri via road kothapally, anantharam, vemireddygudem, deepavarigudem from km 0/0 to 8/7, ii. pagidimarri to madhanapuram road from km 0/0 to 3/0 and iii. pagidimarri road to khudavanpur road from km 0/0 to 3/0 ( including constructions of hlb at km 8/2-4 on somannavagu in nalgonda district ( sub work: providing consultancy services for conducting topograhical survey and preparation of plan and profile)

Read more
Improvement and strengthening of existing road (flood prone area ) from poinguinim bazzar to adinalla at welwada in v.p. poinguinim in canacona constituency.

Improvement and strengthening of existing road (flood prone area ) from poinguinim bazzar to adinalla at welwada in v.p. poinguinim in canacona constituency.&amp#x0d

Read more
Annual work contract for cleaning of accumulated fly ash dust around the silo of phi phii phiii silo area roadsopen space near silo by hiring the jcb machine with sel and operator loading into the trucksdispose off into ash sump at 4x210mw silo

Annual work contract for cleaning of accumulated fly ash dust around the silo of phi phii phiii silo area roadsopen space near silo by hiring the jcb machine with sel and operator loading into the trucksdispose off into ash sump at 4x210mw silo

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise