Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Bza Gdr Section: Vijayawada Division (Sanctioned In Pwp No.31062 Of 2023 24) Electrification For Di Line Length Of 7.35 Km Between Rly.Km:361.00 And Km:372.00 In Different Chainage Stretches From Br.No.619 To Machavaram Station.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76991765 |
Reference Number |
B-E29-TRD-TNDR-9-24-25 |
Tender Fee | 0 |
EMD | 3.43 Lakh |
Tender Value | |
Place | Secunderabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76991765/viewNitPdf_4688882.pdf |
Start Date | August 28, 2024 17:42 |
End Date |
23/09/2024 ( Expired 286 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road of 4m wide between metro median and existing nhai main carriageway along hosur main road between bommasandra and central silk board in stretches between metro piers,rp616 to rp207 for a length of 5.244 km of r5 line of bmrcl,ph-2
Construction of road of 4m wide between metro median and existing nhai main carriageway along hosur main road between bommasandra and central silk board in stretches between metro piers,rp616 to rp207 for a length of 5.244 km of r5 line of bmrcl,ph-2
Read moreConstruction of 2-lane rob on rhs at railway km.568/17-19 near kondapalli station on kazipet-vijayawada section of vijayawada division at km.5.467 of ibrahimpatnam-chandragudem section of nh-30 in the state of ap
Construction of 2-lane rob on rhs at railway km.568/17-19 near kondapalli station on kazipet-vijayawada section of vijayawada division at km.5.467 of ibrahimpatnam-chandragudem section of nh-30 in the state ofap
Read moreSignalling works in connection with ctr/ttr works under ph-31 for pwp 2023-24 in south section of mumbai division & shifting of neutral section at km 39/320 between klva - mbq section on dn th line.
For complete deion and other details, please refer to tender
Read moreVijayawada division - kvdu-pua section : provision of safety fencing / boundary wall for 130 kmph using fixed knot fencing with high tensile steel wire coated with bezinal 2000 for 15 km fencing length (phase-i) in den/central/bza jurisdiction. (id.no.11.06.16.24.3.55.010 of umbrella 2023-24)
For complete deion and other details, please refer to tender
Read moreGeneral-routine maintenance 2023-2024 -cluster 1-one year running contract for various pwd roads section vennikkulam zone 3 in pathanamthitta district 2 road stretches for a total length of 4 km-general civil work-1
General-routine maintenance 2023-2024 -cluster 1-one year running contract for various pwd roads section vennikkulam zone 3 in pathanamthitta district 2 road stretches for a total length of 4 km-general civil work-1
Read more(rc ii phase i 2023-24 corrected) rm/ rc ii phase i/ 2024-25 financial year / one year rc -zone iii-for various pwd roads under roads section kumily in idukki district -3 road stretches for a length of 13.610 km.-rc 2-phase -1
(rc ii phase i 2023-24 &#x0d corrected) rm/ rc ii phase i/ 2024-25&#x0d financial year / one year rc -zone iii-for&#x0d various pwd roads under roads section &#x0d kumily in idukki district -3 road stretches for&#x0d a length of 13.610 km.-rc 2-phase -1
Read more1. sw-i sc division: kzj-bza section - provision of additional vent way to bridge no. 569 a (up & dn line portion) as precast rcc box of size 2 x 5.50x3.00m at km 430/10-12 between kesamudram - tadalapusapalli stations by air pushing method using 20.40m rh girder. 2. sw-ii sc division: kzj-bza section - provision of additional vent way to bridge no. 569 b (up & dn line portion) as precast rcc box of size 2 x 5.50x3.00m at km 430/18-20 between kesamudram - tadalapusapalli station
For complete deion and other details, please refer to tender
Read moreVijayawada division: sw-i: trr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660 density with new 60kg/r260 rails (lwr) for a total length of 4.20 km between gdr - bza & ki-bza sections. sw-ii: (i) tfr(a/f): through renewal of fittings on psc sleeper track from km 429.600- 431.400 on dn line for a total length of 1.800 km between bza-vskp section, (ii): gj:- through renewal of glued joints for a total of 43 nos. (60kg) at various locations between ki -bza section, (iii): ttr (rails)
For complete deion and other details, please refer to tender
Read more(rc ii phase i 2023-24 -corrected) rm/ rc ii phase i/ 2024-25 financial year / one year rc -zone iii-for various pwd roads under roads section -kumily in idukki district -3 road stretches for a length of 13.610 km.
(rc ii phase i 2023-24 -corrected) rm/ rc ii phase i/ 2024-25 financial year / one year rc -zone iii-for various pwd roads under roads section -kumily in idukki district -3 road stretches for a length of 13.610 km.
Read moreGeneral-(rc ii phase i 2023-24 - corrected) rm/ rc ii phase i/ 2024-25 financial year/ one year rc-zone vi -for various pwd roads under roads section pallivasal in idukki dist - 2 road stretches for a length of 9.650 km.
General-(rc ii phase i 2023-24 -&#x0d corrected) rm/ rc ii phase i/ 2024-25&#x0d financial year/ one year rc-zone vi -for&#x0d various pwd roads under roads section pallivasal in idukki dist - 2 road stretches for a&#x0d length of 9.650 km.
Read moreof your Industry type