Tender Details

Particulars Details
Title
M/O Parks And Garden 2024 25.Sub Head Supply Of Summer Seasonal Flowering Plants At Half Bloom Stage For Chanakyapuri Area.
Description
Supply Of Summer Seasonal Flowering Plants At Half Bloom Stage For Chanakyapuri Area.
Organisation New Delhi Municipal Council | State Govt. and UT
Tender Id 2025_NDMC_269533_1
Reference
Number
66/DDH-IV/24-25
Tender Fee 0
EMD 23900
Tender Value
Place New Delhi Municipal Council New Delhi
Link https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=355151
Start Date April 01, 2025 23:35
End Date

09/04/2025 ( Expired 14 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rate contract for supply, installation, configuration, testing and commissioning of structured local area network at various locations in the state of haryana/ chandigarh / delhi ncr

Rate contract for supply, installation, configuration, testing and commissioning of structured local area network at various locations in the state of haryana/ chandigarh / delhi ncr

Read more
Water supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0

Water supply scheme for augmentation of uwss udaipur under district udaipur including 05 years o and m after 01 year defect liability period under amrut 2.0

Read more
Supply of man power 25 no. skilled and unskilled (contract basis) for water supply scheme.session 2025-26

Supply of man power 25 no. skilled and unskilled (contract basis) for water supply scheme at nagar palika parishad dhanpuri distt-shahdol (m.p.) session 2025-26

Read more
Allotment of land on as is where is basis on 30 years long term lease annual lease rental basis of plot 101172 sq.m 25 acres in zone z-3 for setting up bulk liquid and gas storage terminal facility at lova garden area under visakhapatnam po

Allotment of land on as is where is basis on 30 years long term lease annual lease rental basis of plot 101172 sq.m 25 acres in zone z-3 for setting up bulk liquid and gas storage terminal facility at lova garden area under visakhapatnam port authori

Read more
Supply of material and erection of equipments and structure for construction of 01 no. 132/33kv bay at 132kv sub-station harraiya under electricity transmission division-i, basti

Supply of material and erection of equipments and structure for construction of 01 no. 132/33kv bay at 132kv sub-station harraiya under electricity transmission division-i, basti

Read more
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham

Read more
Tender for the work of supply, erection, testing and commissioning of new 10mva powers transformer at 33/11kv pontemol substation, under the jurisdiction of sub div-i, curchorem

Tender for the work of supply, erection, testing and commissioning of new 10mva powers transformer at 33/11kv pontemol substation, under the jurisdiction of sub div-i, curchorem

Read more
Providing and laying of pipe line for water supply from grathlan nallah near surge shaft road to power house field hostel at power house site office area, pakal dul he project, kishtwar, jnk

Providing and laying of pipe line for water supply from grathlan nallah near surge shaft road to power house field hostel at power house site office area, pakal dul he project, kishtwar, jnk

Read more
Supply and delivery of one set of cage bar for stage 2 crusher at chp ktps

Supply and delivery of one set of cage bar for stage 2 crusher at chp ktps

Read more
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period

Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise