Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Natural Calamity Esti For Replacement Of 1no 9mtr Peachiparai Loc 3nos 8mtr In Palazhi Ss Damaged Due To Under R Klm Section In Various Works And Various Section Under Rklm Section In Tky Division..
|
| Description |
Natural Calamity Esti For Replacement Of 1no 9mtr Peachiparai Loc 3nos 8mtr In Palazhi Ss Damaged Due To Under R Klm Section In Various Works And Various Section Under Rklm Section In Tky Division..&Amp#X0d
&Amp#X0d
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_420317_1 |
|
Reference Number |
EE/D/TKY/ETW16/Dt.07.02.2024 |
| Tender Fee | 0 |
| EMD | 2860 |
| Tender Value | - |
| Place | o/o EE/D/TKY |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=499709 |
| Start Date | February 08, 2024 14:30 |
| End Date |
Expired
21/02/2024
Expired 966 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Natural calamity estimate for the replacement of 1no damaged double pole ab switch and 3nos damaged 9mtr psc pole and 1no damaged rsj pole along with 2nos damaged 8mtr stud poles by new ab switch and poles, damaged due to fallen pf peepal tree on 30
Natural calamity estimate for the replacement of 1no damaged double pole ab switch and 3nos damaged 9mtr psc pole and 1no damaged rsj pole along with 2nos damaged 8mtr stud poles by new ab switch and poles, damaged due to fallen pf peepal tree on 30
Read moreNatural calamity esti for the repl of 3nos 8 mtr psc pole at loc fii /6,7,8 of pambanvilai channelkarai ss iv -63 kva damaged due to fallen of tree over lt line on 18.11.2024.
Natural calamity esti for the repl of 3nos 8 mtr psc pole at loc fii /6,7,8 of pambanvilai channelkarai ss iv -63 kva damaged due to fallen of tree over lt line on 18.11.2024.
Read more1 natural calamity estimate for the replacement of damaged 3nos 8mtr psc pole at loc no fii 14 15 16 of kallankuzhi ss ii 100 kva due to fallen of palm tree over lt line under thiruvattar section in thuckalay division
1 natural calamity estimate for the replacement of damaged 3nos 8mtr psc pole at loc no fii 14 15 16 of kallankuzhi ss ii 100 kva due to fallen of palm tree over lt line under thiruvattar section in thuckalay division
Read more1dcw estimate for shifting of 2nos 9mtr psc pole and 2nos 8mtr psc pole in various loc of aruvikkarai to mathoor area as per the request of the assistant engineer highways thuckalay under klm urban section in various works andvarioussection undertky
1dcw estimate for shifting of 2nos 9mtr psc pole and 2nos 8mtr psc pole in various loc of aruvikkarai to mathoor area as per the request of the assistant engineer highways thuckalay under klm urban section invariousworks and various section undertky
Read moreDcw estimate has been prepared for shifting of 1no meter board sc no 163 001 477 by providing of 1no ion of 9mtr psc pole at loc f1 6a in thiruvattar ss i 250kva as per the request of thiru.padma raj at thiruvattar under thiruvattar section i
Dcw estimate has been prepared for shifting of 1no meter board sc no 163 001 477 by providing of 1no ion of 9mtr psc pole at loc f1 6a in thiruvattar ss i 250kva as per the request of thiru.padma raj at thiruvattar under thiruvattar section i
Read more1 dcw estimate has been prepared for shifting of 1no meter board sc no 163 001 477 by providing of 1no ion of 9mtr psc pole at loc f1 6a in tvr ss i 250kva as per the request of thiru padma raj at tvr under tvr section in thuckalay division
1 dcw estimate has been prepared for shifting of 1no meter board sc no 163 001 477 by providing of 1no ion of 9mtr psc pole at loc f1 6a in tvr ss i 250kva as per the request of thiru padma raj at tvr under tvr section in thuckalay division
Read moreE.l.d.c no. sm ii/p1/1820 /2025sitc of 3nos of 12metre highmast with 150w led fl fitting nr library fishing boat area at chinnakuppam beach at fishing boat area at periyakuppam beach nr ennore high rd 1no 8mtr mini mast at anna park dn 2 zone 1
Sitc of 3nos of 12metre highmast with 150w led flood light fitting nr library fishing boat area at chinnakuppam beach at fishing boat area at periyakuppam beach nr ennore high rd 1no 8mtr mini mast at anna park dn 2 zone1
Read moreof your Industry type