Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Median/Planter At Nh 8 From Balicha To Seth Ji Kundal. 0501
|
| Description |
Construction Of Median/Planter At Nh 8 From Balicha To Seth Ji Kundal. 0501
|
| Organisation | UIT Udaipur | State Govt. and UT |
| Tender Id | 2025_UITUD_462215_1 |
|
Reference Number |
NIT_05_01 |
| Tender Fee | 4360 |
| EMD | 3.8 Lakh |
| Tender Value | - |
| Place | Udaipur |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=983159 |
| Start Date | April 13, 2026 23:30 |
| End Date |
Expired
27/04/2026
Expired 173 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing flexible median marker as centre median at marthandam bridge from km 604 292 km 605 200 of nh 47 road kuzhithurai side
Providing flexible median marker as centre median at marthandam bridge from km 604 292 km 605 200 of nh 47 road kuzhithurai side
Read moreProviding flexible median marker as centre median at marthandam bridge from km 605 750 km 606 803 of nh 47 road pammam side
Providing flexible median marker as centre median at marthandam bridge from km 605 750 km 606 803 of nh 47 road pammam side
Read moreRenewal of left out portion of nh-8 (balicha to kaya existing byepass) from km 281, 400 to km 286.00 distt. udaipur
Renewal of left out portion of nh-8 (balicha to kaya existing byepass) from km 281, 400 to km 286.00 distt. udaipur
Read moreBituminous surfacing repair work on nagla radhe road from nh-2 to shiv ji temple.
Bituminous surfacing repair work on nagla radhe road from nh-2 to shiv ji temple.
Read moreConstruction of railing (both side) on median and road safety works from km 256.550 to km 299 (site km 263.160 to km 306.700) on nh 52 in the state of rajasthan
Construction of railing (both side) on median and road safety works from km 256.550 to km 299 (site km 263.160 to km 306.700) on nh 52 in the state of rajasthan
Read moreSpecial repair work construction of rcc crash barrier at urban stretch in median from ch. 308.359 to 315.500 of ch. jodhpur-pali road on section of nh-62 in dbfot stretch
Special repair work construction of rcc crash barrier at urban stretch in median from ch. 308.359 to 315.500 of ch. jodhpur-pali road on section of nh-62 in dbfot stretch
Read moreAnnounc no 329/2021 of honorable c.m. ji scheme for water drainage and beautification work in under assembly constituency nanakmatta. (job-02) construction drain-3 for water drainage from flour mill to main road nh 9 in ward no. 07 of km 0.000 0.535
Announc no 329/2021 of honorable c.m. ji scheme for water drainage and beautification work in under assembly constituency nanakmatta. (job-02) construction drain-3 for water drainage from flour mill to main road nh 9 in ward no. 07 of km 0.000 0.535
Read moreStrengthening and profile correction with cd work at nh-8 from balicha tiraha to kundal (km. 278.00 to km. 280.400), udaipur 1201
Strengthening and profile correction with cd work at nh-8 from balicha tiraha to kundal (km. 278.00 to km. 280.400), udaipur 1201
Read moreConvertion of existing hand pump scheme into piped scheme village seth ji ki kundal under jal jeevan mission ps girwa tehsil girwa district udaipur
Se nit 70 _2023_24
Read moreConstruction of median/planter at various main roads in south extension scheme. 9101
Construction of median/planter at various main roads in south extension scheme. 9101
Read moreof your Industry type