Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Nallah Bank Erosion Control Structures(nbec) Protection Bund At Phochey Nallah , Command Area Tingmosgang.(Under Sdp)
|
Description |
Construction Of Nallah Bank Erosion Control Structures(nbec) Protection Bund At Phochey Nallah , Command Area Tingmosgang.(Under Sdp)
|
Organisation | Rural Development and Panchayati Raj | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2000 |
EMD | 5.4 Lakh |
Tender Value | |
Place | Leh |
Link |
AAAAAAAAAA Login to view |
Start Date | May 22, 2025 22:30 |
End Date |
02/06/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreCa no cwe/amb/south-87 of 2024-25 construction of vocational lab at pm shri kendriya vidyalaya no 03 at ambala cantt under ge (south) ambala cantt
Ca no cwe/amb/south-87 of 2024-25 construction of vocational lab at pm shri kendriya vidyalaya no 03 at ambala cantt under ge (south) ambala cantt
Read moreConstruction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Construction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Read moreConstruction of flood protection wall, rain water harvesting, ramps at 66kv s/s sukhewala under o and m division ferozepur
Construction of flood protection wall, rain water harvesting, ramps at 66kv s/s sukhewala under o and m division ferozepur
Read moreConstruction of flood protection wall, rain water harvesting, ramps at 66kv s/s mahatam nagar under o and m fazilka
Construction of flood protection wall, rain water harvesting, ramps at 66kv s/s mahatam nagar under o and m fazilka
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreof your Industry type