Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Procurement Of Lead Acetate Tape For Total Sulphur Analyzer For Ammonia Section At Hurl Gorakhpur
|
Description |
Procurement Of Lead Acetate Tape For Total Sulphur Analyzer For Ammonia Section At Hurl Gorakhpur
|
Organisation | Hindustan Urvarak and Rasayan Limited | Central Govt. Ministry/Department |
Tender Id | 2024_HURL_796586_1 |
Reference Number |
H/G/CNM/23-24/P-771/TE-888 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | HURL GORAKHPUR |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=841707 |
Start Date | March 14, 2024 23:30 |
End Date |
23/03/2024 ( Expired 471 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Construction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Read moreConstruction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Construction of 6-lane light vehicular underpass (lvup) (1x12x4m) at km.19.737 (annojiguda jn.) along with service roads under morth identified blackspot (ts-05-127) for the period 2019-21 on hyderabad-yadgiri section of nh-163 in the state of telang
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreSelection of agency to engage interested firms for bioremediation and phyto- remediation of 67 drains at different location of different wastewater carrying capacity with a total of around 30.27 mld.
Selection of agency to engage interested firms for bioremediation and&#x0d phyto- remediation of 67 drains at different location of different&#x0d wastewater carrying capacity with a total of around 30.27 mld.
Read moreConsultancy services for authoritys engineer for supervision of construction of a-vop at manegaon village at km 468.260 (wainganga bridge to mh/cg border section of nh-53) and b-vop at km 120.213 at basamba phata (washim-pangare section of on nh-161
Consultancy services for authoritys engineer for supervision of construction of a-vop at manegaon village at km 468.260 (wainganga bridge to mh/cg border section of nh-53) and b-vop at km 120.213 at basamba phata (washim-pangare section of on nh-161
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreShort term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma
Short term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma
Read moreExtension of 33kv bus section and shifting of 3nos 33kv feeder bays for de-parallel operation of 50mva ptr-iii and 80mva ptr-ii at 132kv ss r.c.puram
Extension of 33kv bus section and shifting of 3nos 33kv feeder bays for de-parallel operation of 50mva ptr-iii and 80mva ptr-ii at 132kv ss r.c.puram
Read moreShifting of hsc tap connections at drain/culvert crossing pipes at nehrunagar, sarada colony, vasantharayapuram, rajeev gandhi nagar elsrs areas for avoid contaminataion of water in div no.50,51,53 to 56 under ae-14 section
Shifting of hsc tap connections at drain/culvert crossing pipes at nehrunagar, sarada colony, vasantharayapuram, rajeev gandhi nagar elsrs areas for avoid contaminataion of water in div no.50,51,53 to 56 under ae-14 section
Read moreof your Industry type