Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Day To Day Operation Of Installed Pumps In Shifts During Non Monsoon Period 2023 24 In Khadia Mines For A Period Of 245 Days.
|
| Description |
Day To Day Operation Of Installed Pumps In Shifts During Non Monsoon Period 2023 24 In Khadia Mines For A Period Of 245 Days.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_NCL_295377_1 |
|
Reference Number |
KHD/EM/E-Tender/23-24/430 DT 05.12.2023 |
| Tender Fee | - |
| EMD | 22500 |
| Tender Value | - |
| Place | GM Office Khadia |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | December 09, 2023 00:25 |
| End Date |
Expired
18/12/2023
Expired 1029 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of additional 34 nos. of 80 to 100hp diesel engine driven dewatering pumps for the use of zones 1 to 15 for the period of 2 months 60 days during the monsoon period as per tender conditions
Hiring of additional 34 nos. of 80 to 100hp diesel engine driven dewatering pumps for the use of zones 1 to 15 for the period of 2 months 60 days during the monsoon period as per tender conditions
Read moreAnnual maintenance contract (amc) of operator cabin air conditioning system of 09 nos rel make drill machines of khadia project for a period of 01 year (365 days).
Annual maintenance contract (amc) of operator cabin air conditioning system of 09 nos rel make drill machines of khadia project for a period of 01 year (365 days).
Read moreAnnual maintenance contract (amc) of operator cabin air conditioning system of 04 nos epiroc make drill machines of khadia project for a period of 01 year (365 days).
Annual maintenance contract (amc) of operator cabin air conditioning system of 04 nos epiroc make drill machines of khadia project for a period of 01 year (365 days).
Read moreDay to day repair and maintenance of residential buildings including repairing of quarters during change of occupancy (for a period of 730 days) at nehru shatabdi nagar, secl hq, bilaspur
Day to day repair and maintenance of residential buildings including repairing of quarters during change of occupancy (for a period of 730 days) at nehru shatabdi nagar, secl hq, bilaspur
Read moreOl the work of repairing or co-axial line boring or machining of a-frame bearing housing and rear suspension mounting eye housings of cat 777d or e 100t dumpers of khadia project for a period of one year (365 days).
Ol the work of repairing or co-axial line boring or machining of a-frame bearing housing and rear suspension mounting eye housings of cat 777d or e 100t dumpers of khadia project for a period of one year (365 days).
Read moreNortheast monsoon remove of tree branches flood-hit areas and arrangement 2 no s lmv tata ace vehicle (per day 2 shift) hire basis for 92 days in division-64 and 78,unit-15,16 and 17, zone-6.
Northeast monsoon remove of tree branches flood-hit areas and arrangement 2 no s lmv tata ace vehicle (per day 2 shift) hire basis for 92 days in division-64 and 78,unit-15,16 and 17, zone-6.
Read moreCustom bid for services - hiring of light commercial vehicle like pick up van or tata mobile for electric trip shed lucknow jn for the period of two years per day charges for hired lcv 24x7 for 730 days,custom bid for services - additional charges per km for running lcv upto 2000 km per month that is 48000 km for 02 yrs
Custom bid for services - hiring of light commercial vehicle like pick up van or tata mobile for electric trip shed lucknow jn for the period of two years per day charges for hired lcv 24x7 for 730 days,custom bid for services - additional charges per km for running lcv upto 2000 km per month that is 48000 km for 02 yrs
Read moreDay to day operation in shift of installed pumps in khadia mines during monsoon 2024 and non monsoon 2024-25 for a period of one year.
Day to day operation in shift of installed pumps in khadia mines during monsoon 2024 and non monsoon 2024-25 for a period of one year.
Read moreDay to day running maintenance of pump sets and other miscellaneous work associated with pumps in mines and workshops during non-monsoon period 2023-24 in khadia mines for a period of 220 days
Day to day running maintenance of pump sets and other miscellaneous work associated with pumps in mines and workshops during non-monsoon period 2023-24 in khadia mines for a period of 220 days
Read moreDay to day running maintenance of pump sets and other miscellaneous work associated with pumps in mines and workshop during monsoon and non-monsoon 2025-26 period in khadia mines for a period of one year
Day to day running maintenance of pump sets and other miscellaneous work associated with pumps in mines and workshop during monsoon and non-monsoon 2025-26 period in khadia mines for a period of one year
Read moreof your Industry type