Tender Details
Particulars | Details |
---|---|
Title |
Balance Work Of Construction Of High Level Bridge 70.50 M Long Over Patti Drain Crossing Patti Sirhali Road Including Its Approaches In District Tarn Taran Under Head 5054 Rb10.
|
Description |
Balance Work Of Construction Of High Level Bridge 70.50 M Long Over Patti Drain Crossing Patti Sirhali Road Including Its Approaches In District Tarn Taran Under Head 5054 Rb10.
|
Organisation | CE-PWD(B and R) | State Govt. and UT |
Tender Id | 2025_CEPW_137163_1 |
Reference Number |
Bid No 15 dated 21-03-2025 70.50M |
Tender Fee | 10900 |
EMD | 1.46 Lakh |
Tender Value | |
Place | Tarn Taran |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=276833 |
Start Date | March 24, 2025 21:30 |
End Date |
01/04/2025 ( Expired 69 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of bridge on pathri roh river at hettampur, km 3 of roshanabad-biharigarh motor road in the assembly constituency bhel ranipur in haridwar district under c.r.i.f
Construction of bridge on pathri roh river at hettampur, km 3 of roshanabad-biharigarh motor road in the assembly constituency bhel ranipur in haridwar district under c.r.i.f
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreConstruction work of a bridge in place of the green bridge connecting deepnagar and kedarpuram in the dharampur constituency of dehradun district under the state sector.
Construction work of a bridge in place of the green bridge connecting deepnagar and kedarpuram in the dharampur constituency of dehradun district under the state sector.
Read moreConstruction work of cc road and rcc drain from rambhawan tiraha to railway crossing
Construction work of cc road and rcc drain from rambhawan tiraha to railway crossing in np shankargarh prayagraj
Read moreConstruction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Construction of h.l. steel bridge single span 42m c/c of bearing over narwana branch canal at rd 11862 x-ing chanarthal kalan to gt road sadhugarh via attapur including its approaches, dismantling and 1.5m span slab culvert under pmgsy-iii (batch-1)
Read moreConstruction of high level bridge of 2 span 15 m each eff over kiran drain at rd 2.70 km under pmgsy iii
Construction of high level bridge of 2 span 15 m each eff over kiran drain at rd 2.70 km under pmgsy iii
Read moreof your Industry type