Tender Details
Particulars | Details |
---|---|
Title |
Supply Of Composite Long Rod (Clr) Polymer Insulator 400 K V (120 Kn And 160 Kn) For Nr I, Nr Ii, Nr Iii, Wr Ii Of Powergrid
|
Description |
Supply Of Composite Long Rod (Clr) Polymer Insulator 400 K V (120 Kn And 160 Kn) For Nr I, Nr Ii, Nr Iii, Wr Ii Of Powergrid
|
Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id | 25233 |
Reference Number |
NR3/NT/G-MISC/DOM/CP1/25/01532 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | NR-I, NR-II, NR-III, WR-II of POWERGRID |
Link | https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=b5437225-d2c7-492f-890b-34450f622230 |
Start Date | February 04, 2025 17:30 |
End Date |
03/03/2025 ( Expired 83 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Replacement work of existing porcelain disc insulator strings by silicon rubber housed composite insulator (120 kn suspension type) for 400 kv s/c ratangarh stps ckt 1st and ckt 2nd at suspension towers
Replacement work of existing porcelain disc insulator strings by silicon rubber housed composite insulator (120 kn suspension type) for 400 kv s/c ratangarh-stps ckt 1st and ckt 2nd at suspension towers
Read moreCwe/ggn/gt-03/2025-26 special repair / replacement of flooring, joinery, plastering, sanitary fittings alongwith periodical services and internal e/m works for kv staff qtr type-ii, type-iii and type-iv at af stn narela under ge (af) gurgaon
Special repair / replacement of flooring, joinery, plastering, sanitary fittings alongwith periodical services and internal e/m works for kv staff qtr type-ii, type-iii and type-iv at af stn narela under ge (af) gurgaon
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreConstruction of 02nos. switchyard panel room (spr) & cable trench at 400/220kv getco asoj substation for 400kv indore-asoj ckt-i & ii powergrid owned bays
Construction of 02nos. switchyard panel room spr cable trench at 400 220kv getco asoj substation for 400kv indore asoj ckt i ii powergrid owned bays
Read moreManufacture and supply of erw steel tubes for air preheaters of 210 mw capacity boilers of sgtps, ph-i and ph-ii, birsinghpur.
Manufacture and supply of erw steel tubes for air preheaters of 210 mw capacity boilers of sgtps, ph-i and ph-ii, birsinghpur.
Read moreSupply of ms angles and flats at cmf pallom mf i angamaly and mf ii kolathara for the targeted works under kseb ltd.
Supply of ms angles and flats at cmf pallom mfi angamaly and mf ii kolathara for targeted works under kseb ltd.
Read moreProvn of a temporary exhibit pavilion for product demonstration and patrolling track along with perimeter boundary wall and provn of temporary storage in hanger at tech area- i, ii, iii at deal under ge (i) rnd dehradun
Provn of a temporary exhibit pavilion for product demonstration and patrolling track along with perimeter boundary wall and provn of temporary storage in hanger at tech area- i, ii, iii at deal under ge (i) rnd dehradun
Read moreDevelopment / maintenance of horticulture / arboriculture works in jn port township at sec i, ii and iii for the year 2025-26 and 2026-27
Development / maintenance of horticulture / arboriculture works in jn port township at sec i, ii and iii for the year 2025-26 and 2026-27
Read moreNctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit iii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreHire charges, fitting and fixing of 1 no. 1000 ltr. capacity pvc water tank over tata 107/207/mechanised van for supply of drinking water in different village of sandeshkhali gp, sdk-ii under hasnabad sub-divn. p.h.e. dte. (phase-i)
Hire charges, fitting and fixing of 1 no. 1000 ltr. capacity pvc water tank over tata 107/207/mechanised van for supply of drinking water in different villages of sandeshkhal gp,sdk-ii, under hasnabad sub-divn. p.h.e. dte. (phase-i)
Read moreof your Industry type