Tender Details

Particulars Details
Title
Complete Repairing/Overhauling Of Star Delta Starter 200 Hp 550 Volt 150 Kw Volga Make 3 Phase Si. No Flp 7450 Local Id Jeal/Str/11 At 2 Pit Jealgora Surface Pump Motor Controlling At Jealgora Colliery Under Lodna Area.
Description
Complete Repairing/Overhauling Of Star Delta Starter 200 Hp 550 Volt 150 Kw Volga Make 3 Phase Si. No Flp 7450 Local Id Jeal/Str/11 At 2 Pit Jealgora Surface Pump Motor Controlling At Jealgora Colliery Under Lodna Area.
Organisation Coal India Limited (CIL)
Tender Id 2023_BCCL_288689_1
Reference
Number
BCCL/LA/EnM/F-19/23-24/147
Tender Fee
EMD 1246
Tender Value
Place General Manager office Lodna Area
Link https://coalindiatenders.nic.in
Start Date September 14, 2023 15:30
End Date

25/09/2023 ( Expired 637 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Complete rewinding n repairing of three nos. lt motor, two nos. transformer n two nos. star delta starter having specification are 60 hp three phase 440 volt induction motor100 hp 415 volt sl. no. nadu4s crompton greaves make three phase induc

Complete rewinding n repairing of three nos. lt motor, two nos. transformer n two nos. star delta starter having specification are 60 hp, three phase 440 volt induction motor, 100 hp, 415 volt, sl. no. nadu4s, crompton greaves make three phase induc

Read more
1)complete repairing of 885 hp 660 kw star delta starter 3.3 kv,sl.no.ht 454 make - prabhu akwmc(2) complete repairing of 200 hp,star delta starter make volga type flp 550 vplt sl.no.flp-7444 at aarc akwmc.(3) complete

1)complete repairing of 885 hp 660 kw star delta starter 3.3 kv,sl.no.ht 454 make - prabhu akwmc(2) complete repairing of 200 hp,star delta starter make volga type flp 550 vplt sl.no.flp-7444 at aarc akwmc.(3) complete

Read more
Complete repairing of k.e. make 90 hp, 3 phase, 550 volt slip ring motor at 15 no. direct haulage at pit no. 2 and prabhu make 150 hp, 550 v, 3 phase star-delta ers lying at fan house at pit no. b of pandaveswar colliery under pandaveswar area

Complete repairing of k.e. make 90 hp, 3 phase, 550 volt slip ring motor at 15 no. direct haulage at pit no. 2 and prabhu make 150 hp, 550 v, 3 phase star-delta ers lying at fan house at pit no. b of pandaveswar colliery under pandaveswar area

Read more
Repairing, maintenance and overhauling of (a,b) 2 no 200 amp, 550v, star delta er and (c,d) 2 no 150 amp, 550v, dol starter for motor and (e) 2 nos of 300a acb switches at dhori (k) colliery.

Repairing, maintenance and overhauling of (a,b) 2 no 200 amp, 550v, star delta er and (c,d) 2 no 150 amp, 550v, dol starter for motor and (e) 2 nos of 300a acb switches at dhori (k) colliery.

Read more
Complete repairing rewinding and overhauling of pullen make 120 h.p.550 volt 2900 rpm 6 stage submersible motor and pump set local id. no.joy/ss/120 hp/ at joyrampur colliery of amal. joyrampur colliery under lodna area.

Complete repairing rewinding and overhauling of pullen make 120 h.p.550 volt 2900 rpm 6 stage submersible motor and pump set local id. no.joy/ss/120 hp/ at joyrampur colliery of amal. joyrampur colliery under lodna area.

Read more
Complete repairing rewinding and overhauling of pullen make 550 volt 2900 rpm 120 h.p. submersible motor and 4 stage pump at kalithan pump of submersible point jeenagora section of amal. nt-st-jg colliery under lodna area( local id.no.bccl/jg/pump/1

Complete repairing rewinding and overhauling of pullen make 550 volt 2900 rpm 120 h.p. submersible motor and 4 stage pump at kalithan pump of submersible point jeenagora section of amal. nt-st-jg colliery under lodna area( local id.no.bccl/jg/pump/1

Read more
Complete repairing of volga make 200hp / 150kw 550 volts star delta starter sl no 7158 and gate end box mine line make starter 65hp/550 volt sl. no. 1642 of victory colliery under bastacolla colliery.

Complete repairing of volga make 200hp / 150kw 550 volts star delta starter sl no 7158 and gate end box mine line make starter 65hp/550 volt sl. no. 1642 of victory colliery under bastacolla colliery.

Read more
Complete pump repairing of volga make star delta starter 200hp 550 volts 3 phase sl. no flp 7453 for 9 pit chandmari colliery

Complete pump repairing of volga make star delta starter 200hp 550 volts 3 phase sl. no flp 7453 for 9 pit chandmari colliery

Read more
Partial repairing 1.5 mva 11 kv/550 volt power transformer make electric construction and equipment co. ltd at new sub-station at 7 pit jealgora sl.no. c-6519/82 local id. jl/tr/08 at jealgora colliery of amal.joyrampur colliery under lodna area.

Partial repairing 1.5 mva 11 kv/550 volt power transformer make electric construction and equipment co. ltd at new sub-station at 7 pit jealgora sl.no. c-6519/82 local id. jl/tr/08 at jealgora colliery of amal.joyrampur colliery under lodna area.

Read more
Complete repairing/ rewinding and overhauling of pullen make 210 h.p.550 volt 2900 rpm p-16 submersible motor and p-260 five stage pump sl.no. pp-380048 local id. no. lc/subm/03 at lodna colliery of amal. joyrampur colliery under lodna area.

Complete repairing/ rewinding and overhauling of pullen make 210 h.p.550 volt 2900 rpm p-16 submersible motor and p-260 five stage pump sl.no. pp-380048 local id. no. lc/subm/03 at lodna colliery of amal. joyrampur colliery under lodna area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise