Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation Of Bulk Flow Meter And Control Valve Zones Under 12.5 Mld Wtp At Ranibandh In Connection With 24x7 Water Supply To Rajgangpur Town
|
| Description |
Installation Of Bulk Flow Meter And Control Valve Zones Under 12.5 Mld Wtp At Ranibandh In Connection With 24x7 Water Supply To Rajgangpur Town
|
| Organisation | WATCO Bhubaneswar | State Govt. and UT |
| Tender Id | 2024_WATCO_101770_1 |
|
Reference Number |
WATCO (W)-46(1)/2023-24 Dtd.23.02.2024 |
| Tender Fee | 11800 |
| EMD | 2.73 Lakh |
| Tender Value | - |
| Place | Rajgangpur Town |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=496380 |
| Start Date | February 27, 2024 16:30 |
| End Date |
Expired
11/03/2024
Expired 948 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of valve chamber to the newly erected bulk flow meter on945mm bwsc pumping main near ramreddy gudem wtp in mahabubnagar municipal corporation
Construction of valve chamber to the newly erected bulk flow meter on945mm bwsc pumping main near ramreddy gudem wtp in mahabubnagar municipal corporation
Read moreState plan 2025-26 optimization of production and transmission rennovation of wtp crwss to sreemoolanagaram and kanjoor panchayaths supply and fixing electro magnetic flow meter 3 nos 150mm 200mm 300mm at 13.5 mld wtp chowara
State plan 2025-26 optimization of production and transmission rennovation of wtp crwss to sreemoolanagaram and kanjoor panchayaths supply and fixing electro magnetic flow meter 3 nos 150mm 200mm 300mm at 13.5 mld wtp chowara
Read moreDesigning, programming, testing and commisioning of open channel flow meter for parshall flume at 5 7 mld dattawadi sankhlim wtp inlet along with integration to existing software and centralized display
Designing, programming, testing and commisioning of open channel flow meter for parshall flume at 5 7 mld dattawadi sankhlim wtp inlet along with integration to existing software and centralized display
Read moreInstallation of bulk flow meter and control valve zones under 12.00 mld wtp at ranibagicha in connection with 24x7 water supply to sundargarh town
Installation of bulk flow meter and control valve zones under 12.00 mld wtp at ranibagicha in connection with 24x7 water supply to sundargarh town
Read moreInstallation of bulk flow meter and control valve zones under 4.5 mld wtp at koelnagar and 5.00 mld wtp at vedvyas in connection with 24x7 water supply to rourkela town under amrut 2.0 swap-ii
Installation of bulk flow meter and control valve zones under 4.5 mld wtp at koelnagar and 5.00 mld wtp at vedvyas in connection with 24x7 water supply to rourkela town under amrut 2.0 swap-ii
Read moreInstallation of bulk flow meter and control valve zones under 4.5 mld wtp at koelnagar and 5.00 mld wtp at vedvyas in connection with 24x7 water supply to rourkela town under amrut 2.0 swap-ii
Installation of bulk flow meter and control valve zones under 4.5 mld wtp at koelnagar and 5.00 mld wtp at vedvyas in connection with 24x7 water supply to rourkela town under amrut 2.0 swap-ii
Read moreO and m - mace of cwss to nemmara and kollengode-conveying empty chlorine tonner from 12.5 mld wtp pothundy and 7 mld wtp meenkara to tcc kochi and conveying filled chlorine tonner from tcc kochi to 12.5 mld wtp pothundy 7 mld wtp meenkara
O and m - mace of cwss to nemmara and kollengode-conveying empty chlorine tonner from 12.5 mld wtp pothundy and 7 mld wtp meenkara to tcc kochi and conveying filled chlorine tonner from tcc kochi to 12.5 mld wtp pothundy 7 mld wtp meenkara
Read moreRepairing works to 12.5 mld wtp , amalner municipal council dist jalgaon.
Repairing works to 12.5 mld wtp , amalner municipal council dist jalgaon.
Read moreState plan 2021 2022 part 1 construction of toilets in 9 mld wtp 12.5 mld second stage compound pudussery wtp and pif booster general civil work
State plan 2021 2022 part 1 construction of toilets in 9 mld wtp 12.5 mld second stage compound pudussery wtp and pif booster general civil work
Read moreState plan- state plan 2021-2022 part 1 - construction of toilets in 9 mld wtp , 12.5 mld second stage compound , pudussery wtp and pif booster.general civil work
State plan- state plan 2021-2022 part 1 - construction of toilets in 9 mld wtp , 12.5 mld second stage compound , pudussery wtp and pif booster.general civil work
Read moreof your Industry type