Title
M An R To K.T.Weir At Malwadi,Karhati,Karhati Hs,
Description
M An R To K.T.Weir At Malwadi,Karhati,Karhati Hs,&Amp#X0d Pondhvada G,Pondhvada Jv,Jalgaon Kp, Jalgaon Supe,&Amp#X0d Karhawagaj, Anjangaon, Nepatvalan, Barhanpur, Medad&Amp#X0d And Gunawadi On Karha River For The Year 2024 25, Tal &Amp#X0d Baramati, Dist. Pune (Removing An Plug
Organisation CE-Water Resources Dept. Pune | State Govt. and UT
Tender Id 2024_CWRDP_1043355_1
Reference
Number
K.T.Weir Malwadi,Karhati
Tender Fee 2360
EMD 57000
Tender Value
Place Baramati
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1822545
Start Date June 20, 2024 22:00
End Date

04/07/2024 ( Expired 358 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor

Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Stmc hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29

Short term maintenance contract for hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29 in the state of nagaland in fy 2025-26 percentage rate and work order basis

Read more
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp