Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Additional Floors On Existing Radar Building. Subhead Sitc Including Aicmc For A Period Of 5 Years Of Vrv Vrf System At Newly Constructed Floors, Radar Building, Bikaner Airport.
|
Description |
Construction Of Additional Floors On Existing Radar Building. Subhead Sitc Including Aicmc For A Period Of 5 Years Of Vrv Vrf System At Newly Constructed Floors, Radar Building, Bikaner Airport.
|
Organisation | Airports Authority of India | Public Sector Undertakings |
Tender Id | 2025_AAI_234581_1 |
Reference Number |
AAI/Bikaner/E-E/VRV/VRF/2025 |
Tender Fee | 1180 |
EMD | 1.45 Lakh |
Tender Value | |
Place | AAI, BIKANER AIRPORT, RAJASTHAN |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=267482 |
Start Date | May 20, 2025 18:30 |
End Date |
12/06/2025 ( Expired 25 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Allotment of about 5 acres of port land for construction of mega modern shopping mallwith multiplexat marine drive roadin the port townshipfor a period of 30 (thirty) years on long term lease basis.
Allotment of about 5 acres of port land for construction of mega modern shopping mallwith multiplexat marine drive roadin the port townshipfor a period of 30 (thirty) years on long term lease basis.
Read moreDesign, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room
Design, supply, installation, commissioning, operation and maintenance of medical gas pipeline system at pediatrics building in burdwan mch of west bengal for 3 years and lmo pipeline connection from existing lmo plant to new manifold room
Read moreSitc of lightning protection system at behala govt polytechnic
Construction of partly g 4 partly g 8 storied building civil work, sanitary plumbing work, fire protection system including internal electrification work for proposed new govt. polytechnic at behala in kmc area ward no. 132 sitc of lightn
Read moreSupply installation, testing and commissioning sitc of vrvvrf air conditioning system for new under construction of office infrastructure for well services at 1st floor of laq building ongc mehsana asset
Supply installation, testing and commissioning sitc of vrvvrf air conditioning system for new under construction of office infrastructure for well services at 1st floor of laq building ongc mehsana asset
Read moreConstruction of 4 new foot over bridges in indore on design, built, operate and transfer basis and maintenance of existing three fobs for license period of 10 years (extendable to five years)
Construction of 4 new foot over bridges in&#x0d indore on design, built, operate and transfer&#x0d basis and maintenance of existing three fobs&#x0d for license period of 10 years (extendable to&#x0d five years)
Read moreCanal water based water supply project for construction of 1.50 mld water treatment plant and other related works including operationa and maintenance for a period of 5 years (part-2) at fatehgarh panjtur town, distt. moga, punjab under amrut 2.0
Canal water based water supply project for construction of 1.50 mld water treatment plant and other related works including operationa and maintenance for a period of 5 years (part-2) at fatehgarh panjtur town, distt. moga, punjab under amrut 2.0
Read moreSitc of designed based public address pa system at aurangabad airport with 3 years onsite warranty and 5 years post warranty comprehensive annual maintenance contract with spares
Sitc of designed based public address pa system at aurangabad airport with 3 years onsite warranty and 5 years post warranty comprehensive annual maintenance contract with spares
Read moreInstallation of centralized ac system vrv vrf for newly proposed mechanical lab and engineering drawing hall of mechanical engineering department at iit ism dhanbad
Installation of centralized ac system vrv vrf for newly proposed mechanical lab and engineering drawing hall of mechanical engineering department at iit ism dhanbad
Read moreReplacement of ac units at ans buildings including aicmc for 5 years at cochin international airport (cial)
Replacement of ac units at ans buildings including aicmc for 5 years at cochin international airport (cial)
Read moreUp gradation of existing 30 mt capacity lwb in to 60 mt by way of sitc of fully electronic computerized lwb 60 mt capacity lwb on turnkey basis at fsd ranital of 2 years guarantee period and 3 years comprehensive amc including civil/electrical works.
Up gradation of existing 30 mt capacity lwb in to 60 mt by way of sitc of fully electronic computerized lwb 60 mt capacity lwb on turnkey basis at fsd ranital of 2 years guarantee period and 3 years comprehensive amc including civil/electrical works.
Read moreof your Industry type