Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Set Of Compartment Sliding Doors For Lhb Ac 3 Tier Economy Coaches Drawing: Mplcdlaccned Version 0 And Follow Mdts082, Rev.4.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106508238 |
Reference Number |
04240736 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Hazipur |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/112024/106508238/viewNitPdf_4754685.pdf |
Start Date | October 25, 2024 13:17 |
End Date |
28/11/2024 ( Expired 214 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreE.l.d.c.no/smii/p5/1233/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 3 zones 6 and 9
Selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 3 zones 6 and 9&#x0d
Read moreE.l.d.c.no/smii/p1/1231/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5
Selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5&#x0d
Read moreInstallation of centralized ac system vrv vrf for newly proposed mechanical lab and engineering drawing hall of mechanical engineering department at iit ism dhanbad
Installation of centralized ac system vrv vrf for newly proposed mechanical lab and engineering drawing hall of mechanical engineering department at iit ism dhanbad
Read moreInstallation of two nos of screw chillers in ac system in place of existing vam units 3 and 4 at apcpl.
Installation of two nos of screw chillers in ac system in place of existing vam units 3 and 4 at apcpl.
Read moreUpgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in 1 year defect liability period and 4 year maintenance period
Upgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in which 1 year defect liability period and 4 year maintenance period
Read moreProvn of earthing pit infrastructure at 4 brd, provn of dg set for p-1 bldg, provn of deficient acs against ber, provn of electric supply to arrestor barrier and other certain location at tech area at afs kanpur
Provn of earthing pit infrastructure at 4 brd, provn of dg set for p-1 bldg, provn of deficient acs against ber, provn of electric supply to arrestor barrier and other certain location at tech area at afs kanpur
Read morePurchase of various single phase ac/dc transducers and multifunction meters for davr and ht/lt switchgear ph-4, stps sarni
Purchase of various single phase ac/dc transducers and multifunction meters for davr and ht/lt switchgear ph-4, stps sarni
Read moreSpecial repair maintenance required for extention of 3 phase line in block 1 at new secretariat building agartala for installation of eleven nos 4 tr vertical ac machines in ga p and t law dept home dept and in lounge attached with conference hall
Special repair maintenance required for extention of 3 phase line in block 1 at new secretariat building agartala for installation of eleven nos 4 tr vertical ac machines in ga p and t law dept home dept and in lounge attached with conference hall
Read moreof your Industry type