Tender Details
Particulars | Details |
---|---|
Title |
14/2024 25/Ae/Bcsd 5/Ii/Davanagere
|
Description |
Construction Of Office Building For Regional Office For Epfo At Tumkur. Sh: Providing And Fixing Venetainh Blinds To All The S In Ground Floor, 1st Floor And 2nd Floor Of Epfo Regional Office At Tumkur
|
Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
Tender Id | 78687 |
Reference Number |
14/2024-25/AE/BCSD-5/II/Davanagere |
Tender Fee | 0 |
EMD | 6116 |
Tender Value | |
Place | |
Link | https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=6370776424637077642437383638372431342f323032342d32352f41452f424353442d352f49492f446176616e6167657265 |
Start Date | June 19, 2024 22:25 |
End Date |
26/06/2024 ( Expired 318 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreMaintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Read moreCs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)
Cs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)
Read moreInternal painting and fixing of vitrified floor tiles in field hostel, regional headquarter, nerts, shillong
Internal painting and fixing of vitrified floor tiles in field hostel, regional headquarter, nerts, shillong
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreConstruction of two cages and one indoor building in gib cbc at ramdevra for project gib
Construction of two cages and one indoor building in gib cbc at ramdevra for project gib
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreof your Industry type