Tender Details
Particulars | Details |
---|---|
Title |
Urgent Mtc Road At Jamircherra Sb School Under Pwd(rn B) Manu Sub Division During The Year 2025 26/Sh Wing Wall C C Block Etc
|
Description |
Wing Wall C C Block Etc
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 47831 |
Tender Value | |
Place | Jamircherra |
Link |
AAAAAAAAAA Login to view |
Start Date | May 22, 2025 20:30 |
End Date |
04/06/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreRunning and maintenance of swtp at jatanbari / s.h-1.20 mgd surface water treatment plant at jatanbari nutan bazaar/ repairing and rewinding of v.t pump/motor under the jurisdiction of dws sub-division, karbook, gomati, tripura during the year 2025-2
Running and maintenance of swtp at jatanbari / s.h-1.20 mgd surface water treatment plant at jatanbari nutan bazaar/ repairing and rewinding of v.t pump/motor under the jurisdiction of dws sub-division, karbook, gomati, tripura during the year 2025-2
Read moreCwe/ggn/gt-02/2025-26 reconstruction of existing boundary wall of school building at kv school bawana under ge (af) gurgaon
Reconstruction of existing boundary wall of school building at kv school bawana under ge (af) gurgaon
Read moreQuality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-ii.
Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-ii.
Read moreQuality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.
Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-i.
Read moreQuality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-iii
Quality improvement of drinking water supply by way of construction of 07 (seven) nos. of 5000 gph capacity package type irp in/c 03 nos. semi permanent irp pump house under the jurisdiction of sub-division, kamalpur during the year 2024-25/group-iii
Read moreAAAAAAAAAA
Login to viewLaying additional pipe line and connection of new fhtc under ghoradaha pwss, within khanakul - ii development block, under arambag sub division of hooghly division, p.h.e. dte.
Read moreAAAAAAAAAA
Login to viewC/o teaching and research lab (g plus 4) for indian institute of science education and research (iiser) at bhopal (m.p.). on epc (mode-1). sh: planning, designing and construction of teaching and research lab (g plus 4) consisting of two no. central instrument facility (cif) hall (at g.f.), 24 nos. research lab (6 nos. each at 1st floor, 2nd floor, 3rd floor and 4th floor), 24 nos. research lab (6 nos. each at 1st floor, 2nd floor, 3rd floor and 4th floor), 24 nos. faculty room (6 nos. each at 1st floor, 2nd floor, 3rd floor, and 4 floor), 4 nos. academic lab (1 nos. each at 1st floor, 2nd floor, 3rd floor and 4th floor), ahu rooms, toilets with modular cubical and modular urinal partitions, other rooms (as per architectural drawings), accessible ramps, parking area, accessible road around the building and nearby development etc. including internal water supply, sanitary installation, drainage, all e and m services such as internal e/i ......... including development with bim models.
Read moreAAAAAAAAAA
Login to viewProtection work at head work site of kamarkundu zone-ii pwss under chandannagar sub-division of hooghly division p.h.e dte.
Read moreWbphed/02/bwn of se/cc of 2025-2026 sl.no.4
Different works related sinking of additionaltube-wells interconnection fhtcs construction of pump house boundary wall protection works approach road etc. with 09 nos.pwss of manteswer block of durgapur sub divn under burdwan divn phe dte.&#x0d &#x0d &#x0d
Read moreof your Industry type