Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Leg Curl Machine (Version 2),Rubberized Weight Plates,Rubberized Weight Plates
|
| Description |
|
| Organisation | Higher Education Department, Assam | |
| Tender Id | GEM/2024/B/5730635 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | December 20, 2024 00:05 |
| End Date |
Expired
03/01/2025
Expired 646 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supply and fixing of circuit plates,number plates,phase plates,danger boards and anti climbing devices in 132kv minpur-jogipet,132kv minpur-wattipally and 132kv wattipally-jogipet lines in onm division,narsapur.
Supply and fixing of circuit plates,number plates,phase plates,danger boards and anti climbing devices in 132kv minpur-jogipet,132kv minpur-wattipally and 132kv wattipally-jogipet lines in onm division,narsapur.
Read moreSupply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Read moreSupply and fixing of rubberized speed breaker opp. kapra circle office in ward no.15, dr. a.s. rao nagar in kapra circle-7, mmc(rs.4.00 lakhs)
Supply and fixing of rubberized speed breaker opp. kapra circle office in ward no.15, dr. a.s. rao nagar in kapra circle-7, mmc(rs.4.00 lakhs)
Read moreTransportation of coal from gdk 2 and 2a incline to ocp-1 chp, rg-3 area on weight basis for a period of two years
Transportation of coal from gdk 2 and 2a incline to ocp-1 chp, rg-3 area on weight basis for a period of two years
Read moreTransportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system
Read moreProviding,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of
Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Read moreTransportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Read moreof your Industry type