Tender Details

About Tender

🏗️ Construction Bid: Ventilation Stopping & Cleaning For Chapapur Ii Colliery 🛠️ Eastern Coalfields Limited (Ecl), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Construction Of 8 Ventilation Stopping Structures And The Cleaning Of Fallen Stone And Debris To Enhance Ventilation In The Mehtadih Seam Of The Chapapur Ii Colliery. 🏗️ 📅 Bid Submission Deadline: May 25, 2024, 5:00 Pm A Tender Fee Of Inr 8000 Has Been Set, With No Additional Emd. Interested Parties Must Submit Detailed Proposals, Including Method Statements, Timelines, And Cost Estimates, To Improve The Existing Ventilation System. Keywords: Construction, Ventilation Stopping, Cleaning, Coal Mine, Eastern Coalfields Limited, Psu, Colliery, Tender, Bid Submission
Particulars Details
Title
Construction Of 8(eight) Nos Of Ventilation Stopping And Cleaning Of Fallen Stone And Debrige Are Required For Improving Of Ventilation In Existing Working District Of Mehtadih Seam Of Working Of Chapapur Ii Colliery.
Description
Construction Of 8(eight) Nos Of Ventilation Stopping And Cleaning Of Fallen Stone And Debrige Are Required For Improving Of Ventilation In Existing Working District Of Mehtadih Seam Of Working Of Chapapur Ii Colliery.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_307712_1
Reference
Number
ECL/GM/MA/SRV/24-25/1095/ E-02 Date.07.05.2024
Tender Fee 0
EMD 8000
Tender Value
Place ECL, MUGMA AREA.
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318861
Start Date May 15, 2024 19:30
End Date

25/05/2024 ( Expired 358 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 09 no of sectionalisation stoppings in 43el and 49wl district of bogra r-vi seam at pure searsole colliery

Construction of 09 no of sectionalisation stoppings in 43el and 49wl district of bogra r-vi seam at pure searsole colliery

Read more
Main work :- security measures to honble chief minister of andhra pradesh for repairs to existing compound wall and renewals to internal roads parking area at camp residence, undavalli, tadepalli mandal in guntur district. sub work :- repairs to view cutter to rear side of honble chief minister of andhra prades camp residence and repairs to existing water supply sanitary repairs to police barracks cleaning of debris at camp residence, undavalli, tadepalli mandal in guntur district.

Main work :- security measures to honble chief minister of andhra pradesh for repairs to exising compound wall and renewals to internal roads parking area at camp residence, undavalli, tadepalli mandal in guntur district. sub work :- repairs to view cutter at rear side of honble chief minister of andhra pradesh camp residence and repairs to existing water supply sanitary repairs to police barracks cleaning of debris at camp residence, undavalli, tadepalli mandal in guntur district

Read more
Assistance required for dust suppression in all running faces in district of lws and bagdona seam at tawa-ii mine, pathakhera area, wcl

Assistance required for dust suppression in all running faces in district of lws and bagdona seam at tawa-ii mine, pathakhera area, wcl

Read more
Cleaning/removal of spill coal/fallen coal along all trunk belts and district belts of lower workable seam and bagdona seam at tawa-ii mine, pathakhera area, wcl

Cleaning/removal of spill coal/fallen coal along all trunk belts and district belts of lower workable seam and bagdona seam at tawa-ii mine, pathakhera area, wcl

Read more
Construction of 15 nos. recharge shaft in tank/ ponds of bhandaripokhari and dhamnagar block of bhadrak district under arua scheme for the fy 2025-26

Construction of 15 nos. recharge shaft in tank/ ponds of bhandaripokhari and dhamnagar block of bhadrak district under arua scheme for the fy 2025-26

Read more
Construction of 16 nos. recharge shaft in tank/ ponds of bahanaga and remuna block of balasore district under arua scheme for the fy 2025-26

Construction of 16 nos. recharge shaft in tank/ ponds of bahanaga and remuna block of balasore district under arua scheme for the fy 2025-26

Read more
Spreading of stone dust and white washing along h.road, tr.road, belt road in 4 a seam up to working distt. of west jhagrakhand colliery

Spreading of stone dust and white washing along h.road, tr.road, belt road in 4 a seam up to working distt. of west jhagrakhand colliery

Read more
Construction of cwsn toilet in 3(three) nos. school under killa, matabari and shilachari block, gomati district for the year 2024-25 under samagra shiksha at secondary level/2nd call

Construction of cwsn toilet in 3(three) nos. school under killa, matabari and shilachari block, gomati district for the year 2024-25 under samagra shiksha at secondary level/2nd call

Read more
Construction of porta cabin for child friendly room in ps connaught place, ps tughlak road, ps tilak marg, and ps praliament street in new dehi- district.( 4 nos. porta cabin).

Construction of porta cabin for child friendly room in ps connaught place, ps tughlak road, ps tilak marg, and ps praliament street in new dehli- district.( 4 nos. porta cabin).

Read more
Work of construction of two nos. retaining wall against sump 1md 44lw and 55l 5md in benti block (lower bachra seam) at churi ug colliery

Work of construction of two nos. retaining wall against sump 1md 44lw and 55l 5md in benti block (lower bachra seam) at churi ug colliery

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise