Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Auction Of Scrap Materials Cwss To Puthencruz Thiruvaniyoor Poothrikka And Chottanikkara Panchayaths Package Ii Rwpm Cwpm And Distribution Main In Choondy Ramamangalam Road
|
Description |
Auction Of Scrap Materials Cwss To Puthencruz Thiruvaniyoor Poothrikka And Chottanikkara Panchayaths Package Ii Rwpm Cwpm And Distribution Main In Choondy Ramamangalam Road
|
Organisation | Government of Kerala |
Tender Id | 2023_KWA_593339_1 |
Reference Number |
PD/CHN/AUC-01/2023-24 |
Tender Fee | 2755 |
EMD | 12897 |
Tender Value | |
Place | EE, Project Division,Kochi-11 |
Link | https://etenders.kerala.gov.in |
Start Date | August 07, 2023 20:30 |
End Date |
16/08/2023 ( Expired 675 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Independent engineer services during oandm period for four laning of rajauli - bakhtiyarpur section of nh - 31 (new nh-20) from km. 54.405 to km 101.630 (package - ii) and 101.630 to 152.520 (package iii) on ham mode in the state of bihar.
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConst. of cc road and drain in w.07 adivasee pura main road to nathu singh gurjar ke makan ki or
Const. of cc road and drain in w.07 adivasee pura main road to nathu singh gurjar ke makan ki or
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Construction of rcc drain and culvert from moti pals house via betai shukla maharajs house to the main road in front of renu singhs house at ward no 6
Read morePackage no.ap27pvt172 -l023-road from velangi to pedduru (via) avalthi and anumarthi in kotananduru mandal of kakinada district.est.rs.830.00 lakhs mtc rs.53.60 lakhs
Package no.ap27pvt172 -l023-road from velangi to pedduru (via) avalthi and anumarthi in kotananduru mandal of kakinada district.est.rs.830.00 lakhs mtc rs.53.60 lakhs
Read moreIe services for construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode.
Ie services for construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode.
Read moreConstruction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode
Construction of new six lane access controlled capital region ring road from rameswar (nh16) to gobindpur package ii from design ch. km. 40.700 to km. 70.995 in the state of odisha under nh(o) on hybrid annuity mode
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConstruction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Read moreof your Industry type