Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Of Ramp Protection Wall And Approach Road Of Weigh Bridge (Airawat 2) Under Rocp.
|
| Description |
Strengthening Of Ramp Protection Wall And Approach Road Of Weigh Bridge (Airawat 2) Under Rocp.
|
| Organisation | Eastern Coalfields Limited | ECL_Rajmahal area |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 44100 |
| Tender Value | 35.28 Lakh |
| Place | |
| Link | Login to view |
| Start Date | October 18, 2026 00:25 |
| End Date |
Open
28/10/2026
9 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Kutcha drain cutting from lalghutua dump south east portion through hill top sub-station upto inpit weigh bridge under rocp.
Kutcha drain cutting from lalghutua dump south east portion through hill top sub-station upto inpit weigh bridge under rocp.
Read moreStrengthening of rcc wall along haul road downward side of dmz pump road for protection toe from erosion of dump side under rocp.
Strengthening of rcc wall along haul road downward side of dmz pump road for protection toe from erosion of dump side under rocp.
Read moreLaying of cement concrete near weigh bridge for strengthening of damaged road at sangma siding under a-docm sub area
Laying of cement concrete near weigh bridge for strengthening of damaged road at sangma siding under a-docm sub area
Read moreConstruction of 125 mt capacity weigh bridge civil foundation
Construction of 125 mt capacity weigh bridge civil foundation
Read moreUpgradation and capacity enhancement of weigh bridge 50 to 60 ton dismantling of existing 02 nos. 50 ton weigh bridge and sitc of replaced weigh bridge members including girder plate etc and related work at nmy bahraich
Upgradation and capacity enhancement of weigh bridge 50 to 60 ton dismantling of existing 02 nos. 50 ton weigh bridge and sitc of replaced weigh bridge members including girder plate etc and related work at nmy bahraich
Read moreUpgradation and capacity enhancement of weigh bridge 50 to 60 ton dismantling of existing 01 nos 50 ton weigh bridge and s/i/t/c of replaced weigh bridge members including girder plate etc and related work
Upgradation and capacity enhancement of weigh bridge 50 to 60 ton dismantling of existing 01 nos 50 ton weigh bridge and s/i/t/c of replaced weigh bridge members including girder plate etc and related work
Read moreof your Industry type