Diff.Types Of Electrical Works I.E.Extension Of O/Hline In W/Balong With Erection Of Earthpit,Extension Of Lto/Hline In Jarlahi Patch,Re Tension Of L Tline Conductor And Erection Pole At Budora Colony And Extension3.3 Kv O/Hline At Jarlahi Patch,Ampc
|
| Description |
Diff.Types Of Electrical Works I.E.Extension Of O/Hline In W/Balong With Erection Of Earthpit,Extension Of Lto/Hline In Jarlahi Patch,Re Tension Of L Tline Conductor And Erection Pole At Budora Colony And Extension3.3 Kv O/Hline At Jarlahi Patch,Ampc
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_313103_1 |
|
Reference Number |
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/160 |
| Tender Fee | 0 |
| EMD | 1600 |
| Tender Value | - |
| Place | AMP COLLIERY BARORA AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324467 |
| Start Date | July 23, 2024 00:00 |
| End Date |
Expired
02/08/2024
Expired 801 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
(a)shifting of 02nos.pontoon along with 4000gpm pump of jarlahi sump towards east side sump near ground level and di their pipeline b)installation of a 4000gpm pump on the ground level of jarlahi patch and erection its delivery,ampc.
(a)shifting of 02nos.pontoon along with 4000gpm pump of jarlahi sump towards east side sump near ground level and di their pipeline b)installation of a 4000gpm pump on the ground level of jarlahi patch and erection its delivery,ampc.
Read moreDismantling and di of 3.3 kv overhead line from 1k pit substation of main patch jarlahi pump face of phularitand, ampc under barora area.
Dismantling and di of 3.3 kv overhead line 
 from 1k pit substation of main patch jarlahi pump 
 face of phularitand, ampc under barora area.
Read moreShifting of 02nos.4000gpm pump motor of jarlahi patch sump from the ground level to the pontoon and di of their pipeline due to increase of water level of the sump and maintenance of both the pump and their pipelineof jarlahi patch,ampc.
Shifting of 02nos.4000gpm pump motor of jarlahi patch sump from the ground level to the pontoon and di of their pipeline due to increase of water level of the sump and maintenance of both the pump and their pipelineof jarlahi patch,ampc.
Read moreA)div.of 3.3 kv o/hline at main patch providing power to jarlahi mainpatch pump,motor (b) extension of 3.3 kv o/h line from top dp to coalface baduras/s(c)repairing of 3.3kv o/h line from 1kpit to old pump for highwell near dp of phularitand,ampc
A)div.of 3.3 kv o/hline at main patch providing power to jarlahi mainpatch pump,motor (b) extension of 3.3 kv 
 o/h line from top dp to coalface baduras/s(c)repairing of 3.3kv o/h line from 1kpit to old pump for highwell near dp of phularitand,ampc
Read moreAssembling, transporting and installation of one 4000gpm pump motor set from feeder breaker to jarlahi coal face sump and erection of its delivery line at jarlahi patch, phularitand, amp colliery
Assembling, transporting and installation of one 4000gpm pump motor set from feeder breaker to jarlahi coal face sump and erection of its delivery line at jarlahi patch, phularitand, amp colliery
Read more(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi main patch sump,ampc.
(a)shifting of 02nos. 4000gpm pump motor of jarlahi sump 02times for extraction of coal from floor of the sump (b)lowering 03nos. pontoon along with their pump motor due to gradual decreasing of water level of jarlahi 
 main patch sump,ampc.
Read moreA)erection of 10inch dia ms pipeline from the top bench of jarlahi patch to main patch and(b)shifting of 02nos4000gpm pump motor of jarlahi sump from the pontoon to ground level and othermisc.jobs related to pumping and pipeline workunderampc
A)erection of 10inch dia ms pipeline from the top bench of jarlahi patch to main patch and(b)shifting of 02nos4000gpm pump motor of jarlahi sump 
 from the pontoon to ground level and othermisc.jobs 
 related to pumping and pipeline workunderampc
Read moreDismantling and erection of high tension 3.3 kv overhead line with the extension of motor pumps sets at the h patch and the a patch, w.r.t. karo ocp, bnk area.
Dismantling and erection of high tension 3.3 kv overhead line with the extension of motor pumps sets at the h patch and the a patch, w.r.t. karo ocp, bnk area.
Read moreRepairing of damaged 440v o/h line of kkc link siding, di of 550v o/h line for f/b-2 and erection of earthpit for safety purpose and erection of 440v o/h line for power supply to high mast tower light at jhandi point of phularitand, ampc.
Repairing of damaged 440v o/h line of kkc link siding, di of 550v o/h line for f/b-2 and erection of earthpit 
 for safety purpose and erection of 440v o/h line for power supply to high mast tower light at jhandi point of 
 phularitand, ampc.
Read moreShifting of pump along with dismantling and erection of 10inch dia m.s.pipe range due to displacement of pump and pipeline from existing position during blasting at jarlahi patch, phularitand, amp colliery.
Shifting of pump along with dismantling and erection of 10inch dia m.s.pipe range due to displacement of pump 
 and pipeline from existing position during blasting at jarlahi patch, phularitand, amp colliery.
Read moreof your Industry type