Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Mech Ii Ahp Unit Iv Bah Breakdown And Regular Overhauling Works In Scrapper Feeders Clinker Grinders For The Period From 01 04 2025 To 31 03 2026
|
| Description |
Ttps Mech Ii Ahp Unit Iv Bah Breakdown And Regular Overhauling Works In Scrapper Feeders Clinker Grinders For The Period From 01 04 2025 To 31 03 2026
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_528406_1 |
|
Reference Number |
CE/TTPS/SE/M-II/No.71/2025-26 |
| Tender Fee | 0 |
| EMD | 69000 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=629283 |
| Start Date | February 27, 2025 21:30 |
| End Date |
Expired
14/03/2025
Expired 578 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii ahp replacement of clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly regular make up jetting assembly connected pipe lines flushing header assembly bah structural
Ttps mech ii ahp replacement of clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly regular make up jetting assembly connected pipe lines flushing header assembly bah structural
Read moreTtps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Read moreTtps mechii ahp unitiii fabrication and assembling of feed gate housing enclosure for unit iii bah system during the forthcoming annual overhaul
Ttps mechii ahp unitiii fabrication and assembling of feed gate housing enclosure for unit iii bah system during the forthcoming annual overhaul
Read moreTtps mech ii ahp unit iii annual overhauling works cleaning of ash water pump house sump during the forthcoming annual overhaul
Ttps mech ii ahp unit iii annual overhauling works cleaning of ash water pump house sump during the forthcoming annual overhaul
Read moreTtps mech ii ahp unit iii annual overhauling works of valves replacement of corroded pipes of sea water booster pumps during the forthcoming annual overhaul
Ttps mech ii ahp unit iii annual overhauling works of valves replacement of corroded pipes of sea water booster pumps during the forthcoming annual overhaul
Read moreTtps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul
Ttps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul
Read moreTtps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1000 1500 mtr and cleaning of pipes in all ash slurry disposal lines
Ttps mech ii ahp ash slurry disposal lines unit iv v scrapping removal of ash slag under the 350 nb ash slurry disposal pipe lines at dyke area near chainage 1000 1500 mtr and cleaning of pipes in all ash slurry disposal lines
Read moreTtps mech ii ahp unit iv bah breakdown and regular overhauling works in scrapper feeders clinker grinders for the period from 01 10 2024 to 31 03 2025
Ttps mech ii ahp unit iv bah breakdown and regular overhauling works in scrapper feeders clinker grinders for the period from 01 10 2024 to 31 03 2025
Read moreTtps mech ii ahp unit v bah breakdown and regular overhauling works in scrapper feeders clinker grinders for the period from 01 10 2024 to 31 03 2025
Ttps mech ii ahp unit v bah breakdown and regular overhauling works in scrapper feeders clinker grinders for the period from 01 10 2024 to 31 03 2025
Read moreTtps mech ii ahp unit iv bah breakdown and regular overhauling works in scrapper feeders clinker grinders for the period from 01 04 2024 to 30 09 2024
Ttps mech ii ahp unit iv bah breakdown and regular overhauling works in scrapper feeders clinker grinders for the period from 01 04 2024 to 30 09 2024
Read moreof your Industry type