Tender Details
About Tender
๐ Invitation For Bids: Master Of Education Building & Cafeteria Development, Kbcnmu, Jalgaon ๐ซ๐ ๏ธ The North Maharashtra University, Jalgaon, Invites Bids For The Balance Work Of The Development Project For The Master Of Education Building And Cafeteria Near The Maths (Phase Ii) Building At Kbcnmu. ๐๏ธ ๐ Bid Submission Deadline: April 25, 2024, 5:30 Pm ๐ธ Tender Fee: Inr 2360 ๐ฐ Earnest Money Deposit (Emd): Inr 14300 Interested Contractors Must Have A Proven Track Record In Similar Construction Projects And Should Submit Detailed Bids, Including Work Plans, Timelines, And Cost Estimates, Adhering To The Specifications Outlined In The Tender Document. Keywords: Development Work, Master Of Education Building, Cafeteria, Kbcnmu, North Maharashtra University Jalgaon, Construction, Government Tender, Tender, Bid, Emd, Tender FeeParticulars | Details |
---|---|
Title |
Balance Work Of Development Work For Master Of Education Building And Cafertia Near Maths (Phase Ii) Building In The Premises Of Kbcnmu, Jalgaon
|
Description |
Balance Work Of&Amp#X0d
Development Work For&Amp#X0d
Master Of Education Building And Cafertia Near Maths (Phase Ii) Building In The Premises Of Kbcnmu,&Amp#X0d
Jalgaon
|
Organisation | North Maharashtra University Jalgaon | State Govt. and UT |
Tender Id | 2024_NMUJ_1032098_1 |
Reference Number |
KBCNMU/10/B5/05/e-4 for Year 2023-2024 |
Tender Fee | 2360 |
EMD | 14300 |
Tender Value | |
Place | Kavayitri Bahinabai Chaudhari |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1804816 |
Start Date | March 12, 2024 17:55 |
End Date |
25/04/2024 ( Expired 381 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of two cages and one indoor building in gib cbc at ramdevra for project gib
Construction of two cages and one indoor building in gib cbc at ramdevra for project gib
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreDesign, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable.........
Design, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable ........
Read moreEtender for execution of works for structural modification and lift car installation in in existing ticel phase-iii building at coimbatore, tamil nadu, india
Etender for execution of works for structural modification and lift car installation in in existing ticel phase-iii building
Read moreof your Industry type