Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling And Making New Breaker From Majan Mode To Indra Chauk
|
| Description |
Dismantling And Making New Breaker From Majan Mode To Indra Chauk
|
| Organisation | Directorate Urban Administration and Development | State Govt. and UT |
| Tender Id | 2024_UAD_359101_1 |
|
Reference Number |
2024/UAD/2625 |
| Tender Fee | 2295 |
| EMD | 12480 |
| Tender Value | - |
| Place | Municipal Corporation Singrauli |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=422182 |
| Start Date | July 23, 2024 22:30 |
| End Date |
Expired
06/08/2024
Expired 802 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ward no 11 me chauk se lekar aspatal mode tak nali nirman karya
Ward no 11 me chauk se lekar aspatal mode tak nali nirman karya
Read moreDismantling of old substation & purchase and installation of 11 kv breaker panel (boniyar)
Dismantling of old substation & purchase and installation of 11 kv breaker panel (boniyar)
Read moreE tender for operation of saras parlour no. 162 situated at indra bazar shop no. 510-511 under the ownership of jaipur dairy through ppp mode.
E tender for operation of saras parlour no. 162 situated at indra bazar shop no. 510-511 under the ownership of jaipur dairy through ppp mode.
Read moreDismantling of existing foundation and construction of two no. 220 kv breaker foundation at 220 kv s/s mainpuri, distt- mainpuri.
Dismantling of existing foundation and construction of two no. 220 kv breaker foundation at 220 kv s/s mainpuri, distt- mainpuri.
Read moreDismantling of existing foundation and constuction of two no. 220 kvcircuit breaker foundation at 220 kv sub-station atrauli, distt-aligarh (group-2)
Dismantling of existing foundation and constuction of two no. 220 kvcircuit breaker foundation at 220 kv sub-station atrauli, distt-aligarh (group-2)
Read moreSelection of consultant for preparation of detailed feasibility report (dfr) and providing transaction advisory (ta) services for making revenue from compressed biogas under revenue model on a ppp mode.
Selection of consultant for preparation of detailed feasibility report (dfr) and providing transaction advisory (ta) services for making revenue from compressed biogas under revenue model on a ppp mode.
Read moreMaking temporary arrangements for chhat pooja ghat (19 nos. temporary) located at different locations in tri nagar asembly constituency-16 (03 pit at shakurpur jj colony, 01 pit at indra camp, 01 pit at balmiki camp near fire station keshavpuram and
Making temporary arrangements for chhat pooja ghat (19 nos. temporary) located at different locations in tri nagar asembly constituency-16 (03 pit at shakurpur jj colony, 01 pit at indra camp, 01 pit at balmiki camp near fire station keshavpuram and
Read moreDepartmental estimate for replacing all damaged drums and dismantling repairing of 3 nos. drum float to be used at sump and (2) fixing of 06 nos. electromagnetic flow meter in different pipe line and making arrangement for placing telemetry system
Departmental estimate for replacing all damaged drums and dismantling repairing of 3 nos. drum float to be used at sump and (2) fixing of 06 nos. electromagnetic flow meter in different pipe line and making arrangement for placing telemetry system
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreof your Industry type