Tender Details
Particulars | Details |
---|---|
Title |
Improvement Of Saba Murumba (Vr 38) Km 3/00 To 4/500 Joining To S/R 222 To Mdr 10. Tq. And Dist. Parbhani.
|
Description |
Improvement Of Saba Murumba (Vr 38) Km 3/00 To 4/500 Joining To S/R 222 To Mdr 10. Tq. And Dist. Parbhani.
|
Organisation | RDD-CEO-PARBHANI | State Govt. and UT |
Tender Id | 2025_PARBH_1167300_1 |
Reference Number |
ZPPBN/WD/eTENDER/901/24-25 |
Tender Fee | 6400 |
EMD | 34866 |
Tender Value | |
Place | Tq. and Dist. Parbhani. |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2028689 |
Start Date | April 03, 2025 21:30 |
End Date |
17/04/2025 ( Expired 4 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreShort term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreRepairs/cleaning/laying to sewage lines, manholes, septic tanks and lift well cleaning etc in pocket 1, 2, 3, 4 and purkazi area under age b/r-i of ge roorkee
Repairs/cleaning/laying to sewage lines, manholes, septic tanks and lift well cleaning etc in pocket 1, 2, 3, 4 and purkazi area under age b/r-i of ge roorkee
Read moreInternal improvement works of cluster section no. s-376 (package-3) for water supply schemes 1. kawan wali 2. chak rohella 3. mahatam nagar 4. hasta kalan 5. nawan hasta 6. jhanger bhaini (rette wali bhaini) block and distt. fazilka
Providing, stringing out pvc pipes , household connections, water meter, disinfection unit, painting installation of sign board etc. complete in all respect and all other works contgent there to. (under state share/jjm)
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreImprovement to mdr- 29 to approch road - navalgavan road vr- 71 km. no. 1/200 to 5/00 tq. hingoli
Improvement to mdr- 29 to approch road - navalgavan road vr- 71 km. no. 1/200 to 5/00 tq. hingoli
Read moreConstruction of minor bridge sh 428 to hayatnagar thorava ganeshpur pangrasati rodga akoli joining to sh 427 km 18/00 to 19/00 part pangrasati rodga akoli road odr 38 tq. basmath
Construction of minor bridge sh 428 to hayatnagar thorava ganeshpur pangrasati rodga akoli joining to sh 427 km 18/00 to 19/00 part pangrasati rodga akoli road odr 38 tq. basmath
Read moreSupply, fabrication, welding/joining, erection and testing of hdpe piping from kgs 3 and 4 to kaiga 5 and 6 area.
Supply, fabrication, welding/joining, erection and testing of hdpe piping from kgs 3 and 4 to kaiga 5 and 6 area.
Read moreSurfacing wk incl prep of subgrade, p/l of gsb 15 cm thick, wmm 10 cm thick, wmm 7.5 cm th bm 3 cm th, dbm 5 cm th and berm filling and hard shoulder bet km 23.500 to km 33.500 on rd cstak to nhsl spcn under project sewak in manipur state
Surfacing wk incl prep of subgrade, p/l of gsb 15 cm thick, wmm 10 cm thick, wmm 7.5 cm th bm 3 cm th, dbm 5 cm th and berm filling and hard shoulder bet km 23.500 to km 33.500 on rd cstak to nhsl spcn under project sewak in manipur state
Read moreImprovement to mdr 30 to ar waghjali to kahakar bk taktoda road km 3/239 to 4/300 tq. sengaon
Improvement to mdr 30 to ar waghjali to kahakar bk taktoda road km 3/239 to 4/300 tq. sengaon
Read moreof your Industry type