Tender Details

Particulars Details
Title
Construction Of Foot Over Bridge (Fob) With Lift And Stair At Guindy Race Course Road In Division 172, Zone 13.
Description
Construction Of Foot Over Bridge (Fob) With Lift And Stair At Guindy Race Course Road In Division 172, Zone 13.
Organisation Corporation of Chennai | State Govt. and UT
Tender Id 2025_CoC_531749_1
Reference
Number
S.P.D.C No.B1/0205/2025
Tender Fee 0
EMD 10 Lakh
Tender Value -
Place Kalaignar Maligai, Ripon Building, Chennai
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=632886

Start Date March 17, 2025 14:30
End Date
Expired 02/04/2025

Expired 562 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of foot over bridge (fob) at digha railway station.

Construction of foot over bridge (fob) at digha railway station.

Read more
Provision of 3.0 meter wide foot over bridge (fob) at sariabanjara (sbj) railway station.

Provision of 3.0 meter wide foot over bridge (fob) at sariabanjara (sbj) railway station.

Read more
Ohe work in connection with provision of new foot over bridge (fob) at adityapur station in ckp division.

Ohe work in connection with provision of new foot over bridge (fob) at adityapur station in ckp division.

Read more
Construction of foot over bridge on replacement of existing destressed bridge on masjid station at km 0/5-6 bhandari fob & km 1/2-3 station fob. (mcgm deposit work)

Construction of foot over bridge on replacement of existing destressed bridge on masjid station at km 0/5-6 bhandari fob & km 1/2-3 station fob. (mcgm deposit work)

Read more
Construction of foot over bridge on replacement of existing destressed bridge on masjid stn. at km 0/5-6 bhandari fob & km 1/2-3 station fob. (mcgm deposit work)

Construction of foot over bridge on replacement of existing destressed bridge on masjid stn. at km 0/5-6 bhandari fob & km 1/2-3 station fob. (mcgm deposit work)

Read more
Appointment of contractor for construction of foot over bridge (fob) across western express highway at gundavali metro station (metro line 7).

Appointment of contractor for construction of foot over bridge (fob) across western express highway at gundavali metro station (metro line 7).

Read more
Repair of dawaran uri foot bridge over river jhelum

Repair of dawaran uri foot bridge over river jhelum

Read more
Design, engineering, procurement, manufacture, fabrication, supply, transportation, construction, erection, testing commissioning, operations management for 3 years of foot over bridge (fob) at ada office, aligarh

Design, engineering, procurement, manufacture, fabrication, supply, transportation, construction, erection, testing commissioning, operations management for 3 years of foot over bridge (fob) at ada office, aligarh

Read more
Replacement of connecting foot over bridge at mp-idsa, new delhi

Replacement of connecting foot over bridge at mp-idsa, new delhi

Read more
Ohe modification and other allied work in connection with capacity augmentation rom 200 locos to 250 locos at electric loco shed,6.10m foot over bridge at surat end and ahemdabad end, and foot over bridge with parcel lift at vadodara station.

Ohe modification and other allied work in connection with capacity augmentation rom 200 locos to 250 locos at electric loco shed,6.10m foot over bridge at surat end and ahemdabad end, and foot over bridge with parcel lift at vadodara station.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise