Tender Details
Particulars | Details |
---|---|
Title |
Fabrication Supply Of Sun Shield Roof Truss With Structural Material And Powder Coated Roof Sheet Over The Western Side Of The Hot Water Basin Of Cooling Tower Unit Iv
|
Description |
Fabrication Supply Of Sun Shield Roof Truss With Structural Material And Powder Coated Roof Sheet Over The Western Side Of The Hot Water Basin Of Cooling Tower Unit Iv
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_496439_1 |
Reference Number |
CE MTPS1 SE PA MM JE4 OT NO 551 2024 25 |
Tender Fee | 0 |
EMD | 22100 |
Tender Value | |
Place | MTPS1 METTURDAM |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=589876 |
Start Date | October 24, 2024 22:30 |
End Date |
11/11/2024 ( Expired 161 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provn of heavy duty steel shed with rolled steel section and galvalume sheet alongwith powder coated sliding aluminium window with grill at shed to function as baggage room for personnel of all unit under cg dhq-08 haldia under ge (i) (cgn) kolkata
Provn of heavy duty steel shed with rolled steel section and galvalume sheet alongwith powder coated sliding aluminium window with grill at shed to function as baggage room for personnel of all unit under cg dhq-08 haldia under ge (i) (cgn) kolkata
Read moreRepairing of cooling tower luvers beams and structural beams with other associated portions of unit # 1,2 and 4 at bktpp, during overhauling in the year 2025-26.
Repairing of cooling tower luvers beams and structural beams with other associated portions of unit # 1,2 and 4 at bktpp, during overhauling in the year 2025-26.&#x0d &#x0d
Read moreSupply, delivery and laying of filter sand media,grit and pebbles including removing of old media grit ac pipes, plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, relaying of new sand media , grit and pebbles with replacement of damaged top/bottom and side ms channels with new ms channels, replacement of lateral ac/cpvc etc., for filter beds nos. 1,2,3,4,5 and 9 plastering and water proofing to roof top of wtp building at ph-i, wtp rajampet,sd-i, td-ii
Supply, delivery and laying of filter sand media, grit and pebbles including removing of old media grit ac pipes, plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, relaying of new sand media, grit and pebbles with replacement of damaged top/bottom and side ms channels with new ms channels, replacement of lateral ac/cpvc etc., for filter beds nos 1,2,3,4,5 and 9 plastering and water proofing to roof top of wtp building at phase-i, wtp rajampet under sub-division no.i, kalabgoor, transmission division no.ii, patancheru
Read moreSupply of cooling water pump shaft enclosing tube 1st piece 2nd piece and 5th piece for unit iv and v
Supply of cooling water pump shaft enclosing tube 1st piece 2nd piece and 5th piece for unit iv and v
Read moreThorough replacement of gci roof sheet with zn al coated colour sheet, rectification of damaged roof truss member alongwth other necessary repairing works at power house, inspection bungalow and annex building of sidrapong hydro electric project.
Thorough replacement of gci roof sheet with zn al coated colour sheet, rectification of damaged roof truss member alongwth other necessary repairing works at power house, inspection bungalow and annex building of sidrapong hydro electric project.
Read moreFabrication and supply of line shaft with sleeve with muff coupling assembly for cooling water pump of unit ii
Fabrication and supply of line shaft with sleeve with muff coupling &#x0d assembly for cooling water pump of unit ii
Read moreSupply of top bearing housing for cooling water pump in unit iv and v
Supply of top bearing housing for cooling water pump in unit iv and v
Read moreFabrication and supply of line shaft with sleeve with muff coupling assembly for cooling water pump of unit iii
Fabrication and supply of line shaft with sleeve with muff coupling assembly for cooling water pump of unit iii &#x0d
Read moreTtps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Ttps mech ii bm unit iv replacement of boiler roof sheet including replacement of worn out corroded structural supports painting of structurals removal of existing wornout gi frp asbestos sheets and fixing of new galvalume sheets in boiler
Read moreRepairing of cooling tower luvers beams and structural beams with other associated portions of unit # 1,2 and 4 at bktpp, during overhauling in the year 2025-26.
Repairing of cooling tower luvers beams and structural beams with other associated portions of unit # 1,2 and 4 at bktpp, during overhauling in the year 2025-26.&#x0d &#x0d
Read moreof your Industry type