Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Setting Up It Infrastructure & Preparation Of Site At The New Court Complexes In Phase Iii Of E Cour
|
| Description |
|
| Organisation | Department of Justice | Ministry of Law and Justice |
| Tender Id | GEM/2024/B/5455516 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 30, 2024 20:02 |
| End Date |
Expired
21/10/2024
Expired 721 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | Beatrix System & Services | Make : Service Model : Service Setting up IT infrastructure Title : Setting up IT infrastructure & Preparation of Site at the New Court complexes in Phase III of eCourt | 21-10-2024 12:42:23 | Offline upload | MII | Disqualified |
| 2 | BMG INFORMATICS PRIVATE LIMITED | Make : Service Model : Service Title : Setting up IT infrastructure & Preparation of Site at the New Court complexes in Phase III of eCourt | 21-10-2024 11:25:03 | Offline upload | MII | Qualified |
| 3 | CORPORATE INFOTECH PRIVATE LIMITED. | Make : Service Model : Service Title : Setting up IT infrastructure & Preparation of Site at the New Court complexes in Phase III of eCourt | 21-10-2024 11:03:22 | Vendor Assessed | MII N/A | Qualified |
Request for selection of consultant for the preparation of dpr for sasaram storm water drainage system phase - 2
Request for selection of consultant for the preparation of dpr for sasaram storm water drainage system phase - 2
Read moreCommissioner esd (meeseva) - establishment of aadhaar centers of in-house model - supply and installation of it hardware (aadhaar kits) items - phase-ii
Commissioner esd (meeseva) - establishment of aadhaar centers of in-house model - supply and installation of it hardware (aadhaar kits) items - phase-ii
Read moreImprovement of road from high tension double road to swd way to dr.chandraraje urs house and site no 118 to site no 127 near annapurneshwari temple at vijayanagara 4th stage 2nd phase in hootagalli cmc limit
Improvement of road from high tension double road to swd way to dr.chandraraje urs house and site no 118 to site no 127 near annapurneshwari temple at vijayanagara 4th stage 2nd phase in hootagalli cmc limit
Read moreConstruction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Read moreImprovement of road from high-tension double road to site number 10712 through mahadeshwara provision store at vijayanagara 4th stage, 2nd phase in hootagalli cmc limit
Improvement of road from high-tension double road to site number 10712 through mahadeshwara provision store at vijayanagara 4th stage, 2nd phase in hootagalli cmc limit
Read moreLaying of cc road from yashashree space studio to nesta building near huda techno phase-iii in anjaiah nagar, ward no 230, madhapur circle-50, kukatpally zone, cmc
Laying of cc road from yashashree space studio to nesta building near huda techno phase-iii in anjaiah nagar, ward no 230, madhapur circle-50, kukatpally zone, cmc
Read moreRequest for selection of consultant for the preparation of dpr for selection of suitable tube well sites, determination of pump capacity, assessment of water quality, required, electricity and related infrastructure and technical study of the proposed water supply system in biharsharif.
Request for selection of consultant for the preparation of dpr for selection of suitable tube well sites, determination of pump capacity, assessment of water quality, required, electricity and related infrastructure and technical study of the proposed water supply system in biharsharif.
Read moreImprovement of roads, laying of ugd pipeline and construction of machinehole chambers near nps school site no.6058 to rce layout road at vijayanagara 4th stage 2nd phase in hootagalli cmc limit
Improvement of roads, laying of ugd pipeline and construction of machinehole chambers near nps school site no.6058 to rce layout road at vijayanagara 4th stage 2nd phase in hootagalli cmc limit
Read moreDevolopment of park adjacent to community hall at srinivas nagar colony,phase-iii under ganesh nagar-284, jeedimetla circle-55, quthbullapurzone,cmc (item no.1) (completion period 1 month)
Devolopment of park adjacent to community hall at srinivas nagar colony,phase-iii under ganesh nagar-284, jeedimetla circle-55, quthbullapurzone,cmc (item no.1) (completion period 1 month)
Read moreSupply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Supply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Read moreof your Industry type