Tender Details
Particulars | Details |
---|---|
Title |
Periodical Renewal Of Road From Rambazar To Dukhiakobra Para (L 2.20 Km) Under Old Agartala R.D Block Under Pwd(r And B) Khayerpur Subdivision During The Year 2024 25 S.H. Widening By Gsb, Wbm Ii, Wbm Iii, Carpeting , Sand Seal Coat And Road Side..
|
Description |
Periodical Renewal Of Road From Rambazar To Dukhiakobra Para (L 2.20 Km) Under Old Agartala R.D Block Under Pwd(r And B) Khayerpur Subdivision During The Year 2024 25 S.H. Widening By Gsb, Wbm Ii, Wbm Iii, Carpeting , Sand Seal Coat And Road Side..
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2025_CEPWD_57726_1 |
Reference Number |
158/R/DNIeT/SE-IV/PWD(R and B)/2024-25 |
Tender Fee | 4000 |
EMD | 2.91 Lakh |
Tender Value | |
Place | Jirania |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58712 |
Start Date | January 31, 2025 14:30 |
End Date |
06/02/2025 ( Expired 74 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Periodical repair of road from alpana gram to sharmalunga under amc ward no_1 under jurisdiction of construction sub_division_ii pwd(randb) during the year 2025_26_sh_road side pucca drain ,grouting, carpeting, seal coat etc.(length is 1.00 km)
Periodical repair of road from alpana gram to sharmalunga under amc ward no_1 under jurisdiction of construction sub_division_ii pwd(randb) during the year 2025_26_sh_road side pucca drain ,grouting, carpeting, seal coat etc.(length is 1.00 km)&#x0d &#x0d
Read morePeriodical repair of road from lankamura (goshpara to nathpara under amc ward no_15 under construction sub_division_ii pwd(randb) during the year 2025_26_sh_ road side drain ,grouting, carpeting, seal coat etc.(length is 0.900 km)
Periodical repair of road from lankamura (goshpara to nathpara under amc ward no_15 under construction sub_division_ii pwd(randb) during the year 2025_26_sh_ road side drain ,grouting, carpeting, seal coat etc.(length is 0.900 km)
Read moreFdr/mtc. of road from dalak gamako road to paschim malbassa a.w.c(l-1.450 km) under pwd(randb) amarpur sub-division -i during the year 2024-25/sh- metalling, re-carpetting, sand seal coating, retaining wall, cd etc.
Fdr/mtc. of road from dalak gamako road to paschim malbassa a.w.c(l-1.450 km) under pwd(randb) amarpur sub-division -i during the year 2024-25/sh- metalling, re-carpetting, sand seal coating, retaining wall, cd etc.
Read moreImprovement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Improvement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Read morePeriodical renewal of pmgsy handed over road from kairai to mahanta sikari (l026)(l 5.12 km) ( package no-tr01-250-24) under the performance incentive of pmgsy under mandwi pwd(r and b) sub-division, mandwi block during the year 2024-25..
Periodical renewal of pmgsy handed over road from kairai to mahanta sikari (l026)(l 5.12 km) ( package no-tr01-250-24) under the performance incentive of pmgsy under mandwi pwd(r and b) sub-division, mandwi block during the year 2024-25..
Read morePeriodical renewal of pmgsy handed over road from vrigudas to athuk kwthang (l027)(l 4.606 km) (package no-tr01-250-06a) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from vrigudas to athuk kwthang (l027)(l 4.606 km) (package no-tr01-250-06a) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreMtc. of vanghmun-kanpui road to valley bridge at sabual under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- clearing and grubbing road land, maintenance of earthen shoulder,pucca drain, bm, tack coat, carpeting, seal coat etc.(length
Mtc. of vanghmun-kanpui road to valley bridge at sabual under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- clearing and grubbing road land, maintenance of earthen shoulder,pucca drain, bm, tack coat, carpeting, seal coat etc.(length
Read moreWidening of the road from jalabasa kanchanpur dmc part from ch. 8.22 km to 9.503 km l 1.283 km under damcherra sub division pwd r and b during the year 2025 26 sh- excavation, construction of granular sub base, wbm etc.
Widening of the road from jalabasa kanchanpur dmc part from ch. 8.22 km to 9.503 km l 1.283 km under damcherra sub division pwd r and b during the year 2025 26 sh- excavation, construction of granular sub base, wbm etc.
Read morePr of laljuri to sadaiham para road ch2.130 km to ch3.330 km (length1.200 km), under jampui hill sub-division, pwd(rnb) during the f.y. 2025-2026/sh repair pot holes,tack coat, carpeting, seal coat etc.
Pr of laljuri to sadaiham para road ch2.130 km to ch3.330 km (length1.200 km), under jampui hill sub-division, pwd(rnb) during the f.y. 2025-2026/sh repair pot holes,tack coat, carpeting, seal coat etc.
Read moreMtc. of road from balanoncherra to joymoni para under jamupui hill sub-division during the year 2025-26 sh-pot holes repair, tack coat, carpeting, seal coating, surface drain, drain maintenance and jungle clearing etc.
Mtc. of road from balanoncherra to joymoni para under jamupui hill sub-division during the year 2025-26 sh-pot holes repair, tack coat, carpeting, seal coating, surface drain, drain maintenance and jungle clearing etc.
Read moreof your Industry type