Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) Metro Rail Stations And Depot Sitc Of Wall Floor Mounted Power Supply Boxes And Cables Etc Required For Vrf Outdoor Units At Elevated Stations And Fire Pump Panel At T..
|
| Description |
Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) Metro Rail Stations And Depot Sitc Of Wall Floor Mounted Power Supply Boxes And Cables Etc Required For Vrf Outdoor Units At Elevated Stations And Fire Pump Panel At T..
|
| Organisation | Uttar Pradesh Metro Rail Corporation Limited | Urban Transport |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | September 29, 2026 18:34 |
| End Date |
Open
20/10/2026
6 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of viaduct and elevated stations of gurugram metro rail limited
Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.
Read moreCamc for hvac chiller system at admin building of nmrc depot for 3 years and sitc of vrv/vrf system
Camc for hvac chiller system at admin building of nmrc depot for 3 years and sitc of vrv/vrf system at nmrc head office at sector-29, noida including one time work of cpm, bms reinstatement, sitc of ducting, insulation, cladding etc. at depot
Read moreComprehensive annual maintenance contract (camc) of ups (uninterrupted power supply) installed at depot and eight numbers elevated metro stations for three years in jmrc
Comprehensive annual maintenance contract (camc) of ups (uninterrupted power supply) installed at depot and eight numbers elevated metro stations for three years in jmrc
Read moreComprehensive annual maintenance/ service contract of x-ray baggage inspection system (xbis) at 9 stations (from iit kanpur to motijheel) and 1 depot (polytechnic depot) of upmrc kanpur metro rail project.
Comprehensive annual maintenance/ service contract of x-ray baggage inspection system (xbis) at 9 stations (from iit kanpur to motijheel) and 1 depot (polytechnic depot) of upmrc kanpur metro rail project.
Read moreAnnual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Annual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Read moreRequirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc
Requirement of parking lighting works and viaduct lighting work elevated metro stations in jmrc
Read morePart design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Part design and construction of elevated viaduct, at-grade viaduct, sidings, elevated ramps, entry/exit line to depot, and ten elevated station and one at grade station including civil works excluding architectural finishes and peb of mrts phase-iv.
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreAnnual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Annual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Read moreP1pd60.2026.licensing internal advertisement rights of corridor 01 metro stations of the pune metro rail project for a period of 15 years.
P1pd60.2026.licensing internal advertisement rights of corridor 01 metro stations of the pune metro rail project for a period of 15 years.
Read moreof your Industry type