Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Road By Spreading Of Filling Material At Approach Road Of Nagra Plant To Magzine Building At Ukwa Mine.
|
| Description |
Repairing Of Road By Spreading Of Filling Material At Approach Road Of Nagra Plant To Magzine Building At Ukwa Mine.
|
| Organisation | MOIL Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_MOIL_740579_1 |
|
Reference Number |
AGT/CIVIL/UK/LT/23-24/1564 dt.04.01.2023 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | UKWA MINE |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1043583 |
| Start Date | January 05, 2024 17:45 |
| End Date |
Expired
09/01/2024
Expired 1008 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Carriage of material by mechanical transport from rajnagar opencast mine to 7a1 seam and filling/spreading and leveling on surface cracks ,potholes and subside area of 7a1 seam by over burden material at jhiria ug mine.
Carriage of material by mechanical transport from rajnagar opencast mine to 7a1 seam and filling/spreading and leveling on surface cracks ,potholes and subside area of 7a1 seam by over burden material at jhiria ug mine.
Read moreConst of approach earth filling gravelling at 33 kv ss baghera under aen o and m kekri
Const of approach earth filling gravelling at 33 kv ss baghera under aen o and m kekri
Read moreConstruction of approach cement concrete road 1500 m from shobhapur mine junction to shobhapur gram under csr for the year 2026-27
Construction of approach cement concrete road 1500 m from shobhapur mine junction to shobhapur gram under csr for the year 2026-27
Read moreConstruction of approach road at bemina chowk connecting with bund road by way of retaining wall, earth filling and other allied items.
Construction of approach road at bemina chowk connecting with bund road by way of retaining wall, earth filling and other allied items.
Read moreSurf wk incl constr of subgrade, gsb, wbm, dbm , bc, p/coat, t/coat, hard shoulder and moorum filling on approach rd-2 from km 0 to km 5.531 and approach rd-3 from km 0 to km 4.835 of manipur river (west bank near bp-47) to bp-50 in manipur state
Surf wk incl constr of subgrade, gsb, wbm, dbm , bc, p/coat, t/coat, hard shoulder and moorum filling on approach rd-2 from km 0 to km 5.531 and approach rd-3 from km 0 to km 4.835 of manipur river (west bank near bp-47) to bp-50 in manipur state
Read moreHandling ,transport and other mining services - percentage quote based - job contract for low-lying area development / backfilling of abandoned stone quarry / mine filling in the lead distance 0-100 kms radius of nspcl-bhilai using pond/bottom ash fr..
Handling ,transport and other mining services - percentage quote based - job contract for low-lying area development / backfilling of abandoned stone quarry / mine filling in the lead distance 0-100 kms radius of nspcl-bhilai using pond/bottom ash fr..
Read moreSurf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state
Surf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreRepairing of road by spreading of filling material at approach road of nagra plant to magzine building at ukwa mine
Repairing of road by spreading of filling material at approach road of nagra plant to magzine building at ukwa mine
Read moreof your Industry type