Tender Details

Particulars Details
Title
Operation And Maintenance Of Sewage Treatment Plant (Stp) Based On Moving Bed Bio Reactor (Mbbr) Technology During Yatra 2024 With Its Commissioning Before Commencement Of Yatra 2024 And Decommissioning After Culmination Of Yatra 2024 At Nunwan Camp
Description
Operation And Maintenance Of Sewage Treatment Plant (Stp) Based On Moving Bed Bio Reactor (Mbbr) Technology During Yatra 2024 With Its Commissioning Before Commencement Of Yatra 2024 And Decommissioning After Culmination Of Yatra 2024 At Nunwan Camp
Organisation Government of Jammu and Kashmir
Tender Id 2024_SASB_242470_1
Reference
Number
SASB/eNIT/2024/01
Tender Fee 1000
EMD 50000
Tender Value -
Place Shri Amarnathji Shrine Board Jammu
Link
View Original Tender Notice

https://jktenders.gov.in

Start Date January 10, 2024 14:30
End Date
Expired 24/01/2024

Expired 957 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Annual repair / operation and maintenance of sewage treatment plant stp. (mbbr) and commissioning and decommissioning of plant before and after yatra 2026 at nunwan base camp.

Annual repair / operation and maintenance of sewage treatment plant stp. (mbbr) and commissioning and decommissioning of plant before and after yatra 2026 at nunwan base camp.

Read more
Annual operation and maintenance of sewage treatment plant stp 300 kld (mbbr ) including commissioning and decommissioned of stp before and after yatra 2025 at yatra base camp nunwan.

Annual operation and maintenance of sewage treatment plant stp 300 kld (mbbr ) including commissioning and decommissioned of stp before and after yatra 2025 at yatra base camp nunwan.

Read more
Repairs and installation of existing sign boards, flexes, vinyl before of yatra including dismantling and safe storage after culmination of yatra along baltal axis

Repairs and installation of existing sign boards, flexes, vinyl before of yatra including dismantling and safe storage after culmination of yatra along baltal axis

Read more
Recci survey/inspection of ongoing works before, during and after yatra by engagement of pony/ chopper during annual shri amarnath ji yatra for the year 2024-25

Recci survey/inspection of ongoing works before, during and after yatra by engagement of pony/ chopper during annual shri amarnath ji yatra for the year 2024-25

Read more
Recci survey inspection of ongoing works before, during and after yatra by engagement of pony chopper2026-27.

Recci survey inspection of ongoing works before, during and &amp#x0d after yatra by engagement of pony chopper2026-27.

Read more
Installation of street lights on existing lt poles at yatra base camp mirbazar and walnut factory qazigund and their dismantling after culmination of yatra and back carriage to divisional stores for sanjy 2025.

Installation of street lights on existing lt poles at yatra base camp mirbazar and walnut factory qazigund and their dismantling after culmination of yatra and back carriage to divisional stores for sanjy 2025.

Read more
Installation, testing, commissioning operation and maintainannce of led lights at different yatra sites including their carriage to respective sites and their dismentalling after culmination of yatra including their back carriage to divisional stores

Installation, testing, commissioning operation and maintainannce of led lights at different yatra sites including their carriage to respective sites and their dismentalling after culmination of yatra including their back carriage to divisional stores

Read more
Installation of street lights on existing lt poles at yatra base camp mirbazar and walnut factory qazigund and their dismantling after culmination of yatra and back carriage to divisional stores for sanjy 2025.

Installation of street lights on existing lt poles at yatra base camp mirbazar and walnut factory qazigund and their dismantling after culmination of yatra and back carriage to divisional stores for sanjy 2025.

Read more
Assembling/erection of toilet/baths (303 no.) before yatra along baltal axis (from neelgrath to holy cave and enroute yatra camps) including disassembling and storage at sasb stores after yatra - 2025

Assembling/erection of toilet/baths (303 no.) before yatra along baltal axis (from neelgrath to holy cave and enroute yatra camps) including disassembling and storage at sasb stores after yatra - 2025

Read more
Installation of street lights on existing lt poles at yatra base camp mirbazar, walnut factory qazigund and security base camp khudwani including their dismantling after culmination of yatra and safe back carriage to divisional stores for sanjy 2026

Installation of street lights on existing lt poles at yatra base camp mirbazar, walnut factory qazigund and security base camp khudwani including their dismantling after culmination of yatra and safe back carriage to divisional stores for sanjy 2026

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise