Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Operation And Maintenance Of Sewage Treatment Plant (Stp) Based On Moving Bed Bio Reactor (Mbbr) Technology During Yatra 2024 With Its Commissioning Before Commencement Of Yatra 2024 And Decommissioning After Culmination Of Yatra 2024 At Nunwan Camp
|
| Description |
Operation And Maintenance Of Sewage Treatment Plant (Stp) Based On Moving Bed Bio Reactor (Mbbr) Technology During Yatra 2024 With Its Commissioning Before Commencement Of Yatra 2024 And Decommissioning After Culmination Of Yatra 2024 At Nunwan Camp
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2024_SASB_242470_1 |
|
Reference Number |
SASB/eNIT/2024/01 |
| Tender Fee | 1000 |
| EMD | 50000 |
| Tender Value | - |
| Place | Shri Amarnathji Shrine Board Jammu |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | January 10, 2024 14:30 |
| End Date |
Expired
24/01/2024
Expired 957 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual repair / operation and maintenance of sewage treatment plant stp. (mbbr) and commissioning and decommissioning of plant before and after yatra 2026 at nunwan base camp.
Annual repair / operation and maintenance of sewage treatment plant stp. (mbbr) and commissioning and decommissioning of plant before and after yatra 2026 at nunwan base camp.
Read moreAnnual operation and maintenance of sewage treatment plant stp 300 kld (mbbr ) including commissioning and decommissioned of stp before and after yatra 2025 at yatra base camp nunwan.
Annual operation and maintenance of sewage treatment plant stp 300 kld (mbbr ) including commissioning and decommissioned of stp before and after yatra 2025 at yatra base camp nunwan.
Read moreRepairs and installation of existing sign boards, flexes, vinyl before of yatra including dismantling and safe storage after culmination of yatra along baltal axis
Repairs and installation of existing sign boards, flexes, vinyl before of yatra including dismantling and safe storage after culmination of yatra along baltal axis
Read moreRecci survey/inspection of ongoing works before, during and after yatra by engagement of pony/ chopper during annual shri amarnath ji yatra for the year 2024-25
Recci survey/inspection of ongoing works before, during and after yatra by engagement of pony/ chopper during annual shri amarnath ji yatra for the year 2024-25
Read moreRecci survey inspection of ongoing works before, during and after yatra by engagement of pony chopper2026-27.
Recci survey inspection of ongoing works before, during and &#x0d after yatra by engagement of pony chopper2026-27.
Read moreInstallation of street lights on existing lt poles at yatra base camp mirbazar and walnut factory qazigund and their dismantling after culmination of yatra and back carriage to divisional stores for sanjy 2025.
Installation of street lights on existing lt poles at yatra base camp mirbazar and walnut factory qazigund and their dismantling after culmination of yatra and back carriage to divisional stores for sanjy 2025.
Read moreInstallation, testing, commissioning operation and maintainannce of led lights at different yatra sites including their carriage to respective sites and their dismentalling after culmination of yatra including their back carriage to divisional stores
Installation, testing, commissioning operation and maintainannce of led lights at different yatra sites including their carriage to respective sites and their dismentalling after culmination of yatra including their back carriage to divisional stores
Read moreInstallation of street lights on existing lt poles at yatra base camp mirbazar and walnut factory qazigund and their dismantling after culmination of yatra and back carriage to divisional stores for sanjy 2025.
Installation of street lights on existing lt poles at yatra base camp mirbazar and walnut factory qazigund and their dismantling after culmination of yatra and back carriage to divisional stores for sanjy 2025.
Read moreAssembling/erection of toilet/baths (303 no.) before yatra along baltal axis (from neelgrath to holy cave and enroute yatra camps) including disassembling and storage at sasb stores after yatra - 2025
Assembling/erection of toilet/baths (303 no.) before yatra along baltal axis (from neelgrath to holy cave and enroute yatra camps) including disassembling and storage at sasb stores after yatra - 2025
Read moreInstallation of street lights on existing lt poles at yatra base camp mirbazar, walnut factory qazigund and security base camp khudwani including their dismantling after culmination of yatra and safe back carriage to divisional stores for sanjy 2026
Installation of street lights on existing lt poles at yatra base camp mirbazar, walnut factory qazigund and security base camp khudwani including their dismantling after culmination of yatra and safe back carriage to divisional stores for sanjy 2026
Read moreof your Industry type