Tender Details
About Tender
🏗️ Invitation For Independent Engineer Services 🛣️ The National Highways And Infrastructure Development Corporation Limited (Nhidcl), Under The Central Government, Invites Bids From Qualified Independent Engineers For The Project "4 Laning And Greenfield Alignment Of Karanj Silchar Section In The State Of Assam On Ham Mode." Specifically, For Package I Under The Independent Engineer Services Category. 📅 Bid Submission Deadline: May 01, 2024, 3:00 Pm Tender Fee: Inr 5900 Emd: Inr 200000 Interested Independent Engineers Must Possess The Requisite Qualifications And Experience In Highway Project Management. Detailed Proposals, Including Technical Capabilities And Financial Bids, Are To Be Submitted By The Stipulated Deadline. Keywords: Nhidcl, Independent Engineer Services, Highway Development, Assam, Ham Mode, Infrastructure Project, Tender, Bid, Emd, Tender FeeParticulars | Details |
---|---|
Title |
Nhidcl/Assam/Nh 37/Ham/Ie /S C/Pkg I/2024
|
Description |
Independent Engineer Services For 4 Laning And Greenfield Alignment Of Karanj Silchar Section In The State Of Assam On Ham Mode. Package I
|
Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
Tender Id | 2024_NHIDC_801051_1 |
Reference Number |
NHIDCL/Assam/NH-37/HAM/IE /S-C/Pkg-I/2024 |
Tender Fee | 5900 |
EMD | 2 Lakh |
Tender Value | |
Place | A |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=842034 |
Start Date | April 10, 2024 17:30 |
End Date |
10/06/2024 ( Expired 341 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Read moreAAAAAAAAAA
Login to viewIe services for construction to 2-lane with paved shoulder of tura bypass between existing km 57.500 of nh-127b (design chainage km 0.000) and km 108.750 of nh-217 (design chainage km 29.030) (length 29.030km) on hybrid annuity mode
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreNhidcl/ro-agt/w/t/s -k(pkg-v)/323-part(1)
Special repair work on nh-208 from km 75.700 to km 101.30 (total 
 length 25.600 km) at various sections srirampur to khowai section 
 at the risk and cost of epc contractor in the state of tripura in the fy 
 2025-26 on item rate basis work or
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Read moreRfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Read moreS i t c of new ei system for sandt arrangement to the existing stpp private railway siding including connected infrastructure (for phase i lines of stpp siding and ltc siding from mancherial to srp chp, jaipur vand m, mancherial, ts.
S i t c of new ei system for sandt arrangement to the existing stpp private railway siding including connected infrastructure (for phase i lines of stpp siding and ltc siding from mancherial to srp chp, jaipur vand m, mancherial, ts.
Read moreIe services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Read moreDiesel alternator 12000 hrly routine kit,a,b,c,d,e,f,g,h,i,j,k,l,m,n,o,p,q,r,s,t,u,v,w,x,y,z,aa,ab,
Read more
General-iso certification work in s s f c h i r a y a n k e e z h u -general civil work
General-iso certification work in s s f c h i r a y a n k e e z h u -general civil work
Read moreof your Industry type