Tender Details
Particulars | Details |
---|---|
Title |
R.R. Damages On Palingi To Nichar Road Km 0.00 To 16.00 Sh C.O. R. Wall At Rd 5.935 To 5.950.
|
Description |
R.R. Damages On Palingi To Nichar Road Km 0.00 To 16.00 Sh C.O. R. Wall At Rd 5.935 To 5.950.
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 350 |
EMD | 6900 |
Tender Value | |
Place | Bhabanagar |
Link |
AAAAAAAAAA Login to view |
Start Date | May 28, 2025 16:30 |
End Date |
03/06/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConsrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra
Consrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra
Read moreConstruction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124
Construction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreProtection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreS and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp
S and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp
Read moreof your Industry type