Tender Details
About Tender
🏗️ Invitation For Bids: Interlocking Tiles Road Construction 🌳🛣️ The Vice Chairman Mussoorie Dehradun Development Authority, A State Government Entity, Is Seeking Bids From Experienced Contractors For The Construction Of An Interlocking Tiles Road Surrounding A Newly Constructed Park In Saraswati Vihar, Bhagat Singh Colony Ward No. 49, Dehradun. 📅 Bid Submission Deadline: July 11, 2024, 2:00 Pm Tender Fee: Inr 2360 Emd: Inr 75000 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, Adhering To The Prescribed Tender Documentation Format. Keywords: Construction, Interlocking Tiles Road, Park Development, Mussoorie Dehradun Development Authority, State Government, Ut, Tender, Bid Submission, Emd, Saraswati Vihar, DehradunParticulars | Details |
---|---|
Title |
Construction Of Interlocking Tiles Road Around Newly Construction Park In Saraswati Vihar Bhagat Singh Calony Ward No 49, Dehradun
|
Description |
Construction Of Interlocking Tiles Road Around Newly Construction Park In Saraswati Vihar Bhagat Singh Calony Ward No 49, Dehradun
|
Organisation | Vice Chairman Mussoorie Dehradun Development Authority Dehradun | State Govt. and UT |
Tender Id | 2024_MDDA_73185_1 |
Reference Number |
MDDA/ENG/220/46/23-24 |
Tender Fee | 2360 |
EMD | 75000 |
Tender Value | |
Place | DEHRADUN |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=87715 |
Start Date | July 05, 2024 18:30 |
End Date |
18/07/2024 ( Expired 305 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreConstruction of c.c. road in gali no. 07, bal gangadhar tilak ward no. 01
Construction of c.c. road in gali no. 07, bal gangadhar tilak ward no. 01
Read moreConstruction of sulabh complex near khirka mohalla in ward no 09, nagarparishad chichli
Construction of sulabh complex near khirka mohalla in ward no 09, nagarparishad chichli
Read moreConstruction of cc top layer frm sapna singh house to bichchna road kusum house to lala house chaitu kol house to sbi bank jyoti singh house to munni house, samresh house to santosh jarha shop, behind gm bungle to pani tanki, around krishna colony at
Construction of cc top layer frm sapna singh house to bichchna road kusum house to lala house chaitu kol house to sbi bank jyoti singh house to munni house, samresh house to santosh jarha shop, behind gm bungle to pani tanki, around krishnacolony wn3
Read moreZone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Read moreZone no. 03, ward no. 15, construction of rcc drain from geeta patel ji, ramvati patel ji, sagun patel ji, bp patel ji, shiv shankar soni ji, sunita patel ji, renu patel ji, lal bahadur kushwaha ji, praveen singh ji, ravendra patel ji house behind...
Zone no. 03, ward no. 15, construction of rcc drain from geeta patel ji, ramvati patel ji, sagun patel ji, bp patel ji, shiv shankar soni ji, sunita patel ji, renu patel ji, lal bahadur kushwaha ji, praveen singh ji, ravendra patel ji house behind...
Read moreZone no. 03, ward no. 13, construction of rcc drain and culvert from sunil singh ji house via kaushlesh dwivedi ji house to chunnu shrivastav ji house.
Zone no. 03, ward no. 13, construction of rcc drain and culvert from sunil singh ji house via kaushlesh dwivedi ji house to chunnu shrivastav ji house.
Read moreof your Industry type