Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Vrb Cum Fall At Km 14.150 Of Bagarpur Dy Under Mgc Project Stage Ii Distt. Amroha Lot 28
|
Description |
Construction Of Vrb Cum Fall At Km 14.150 Of Bagarpur Dy Under Mgc Project Stage Ii Distt. Amroha Lot 28
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPIDC_828781_1 |
Reference Number |
01/EE/23-24 LOT 28 |
Tender Fee | 1244 |
EMD | 44000 |
Tender Value | |
Place | MGCCD4 AMROHA |
Link | https://etender.up.nic.in |
Start Date | August 12, 2023 15:30 |
End Date |
18/08/2023 ( Expired 637 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreRepair and resurfacing of existing road and furniture items at various location central areas under age b/r-ii at mil stn bhuj
Repair and resurfacing of existing road and furniture items at various location central areas under age b/r-ii at mil stn bhuj
Read moreConstruction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Construction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreSupply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Read moreNit for complete erection work of construction of 01 no. 132kv and 01 no. 33kv feeder bay along with transformer foundation for add. 50mva transformer at bhander 132kv substation under testing division ii gwalior
Nit for complete erection work of construction of 01 no. 132kv and 01 no. 33kv feeder bay along with transformer foundation for add. 50mva transformer at bhander 132kv substation under testing division ii gwalior
Read moreConstruction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Read moreof your Industry type