Tender Details

Particulars Details
Title
Cons Of Pilling Beside Pond Of Rafikul Sardar Part 235
Description
Cons Of Pilling Beside Pond Of Rafikul Sardar Part 235
Organisation Zilla Parishad | State Govt. and UT
Tender Id 2025_ZPHD_951782_2
Reference
Number
038 /NIET/APAS /BGGP/25-26
Tender Fee 250
EMD 2874
Tender Value
Place BANKRA GOKULPUR GP
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2275558

Start Date November 17, 2025 23:30
End Date
Expired 12/12/2025

Expired 203 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Cons of drain from ranjit mondal house to bangore at simuldihi.(ac id-109661452)

Cons of drain from ranjit mondal house to bangore at simuldihi.(ac id-109661452)

Read more
Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.

Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.

Read more
Construction of safety wall and interlocking on the embankment of the pond in village tahla

Construction of safety wall and interlocking on the embankment of the pond in village tahla

Read more
Construction of anicut, anicut renovation, drop spillway, earthan checkdam, earthan checkdam), sunken pond pakka checkdam and talab renovation panchayat samiti itawa distt. kota (mjsa 2.2 state fund)

Construction of anicut, anicut renovation, drop spillway, earthan checkdam, earthan checkdam), sunken pond pakka checkdam and talab renovation panchayat samiti itawa distt. kota (mjsa 2.2 state fund)

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Fireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited

Fireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited

Read more
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water

Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise