Tender Details

Particulars Details
Title
Custom Bid For Services Development Of Base Coating Process Using Plasma Polymerisation On Stretc
Description
Organisation Department of Defence Research & Development | Ministry of Defence
Tender Id GEM/2025/B/6606782
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date August 25, 2025 19:53
End Date
Expired 15/09/2025

Expired 394 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years Project Experience Required: No
Ministry: Ministry Of Defence
Department: Department Of Defence Research & Development
Organisation: Aeronautical Development Agency
Similar Tenders
Perforated cable tray(width 200mm xheight 50 mm) galvanised coating,installation fitement cable trays and securing of rf cable with all accessories,rcc (cemented) base with metal pipe 02 mtr height with gi plate 7x7 size for antena

Perforated cable tray(width 200mm xheight 50 mm) galvanised coating,installation fitement cable trays and securing of rf cable with all accessories,rcc (cemented) base with metal pipe 02 mtr height with gi plate 7x7 size for antena

Read more
Site preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing

Site preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing

Read more
Urinary leg bag 540 ml,guide wire nitinol core angeled tip point 038 x 150 cm,endopath tri star surgical trocar 5 mm with safety shield,hydrophilic coated guide wires suitable for negotiating tortuous,hydrophilic coated guide wires suitable for negotiating tortuous,hydrophilic coated guide wires suitable for negotiating tortuous,bip foley catheter noble metal alloy coating gold palladium,bip foley catheter noble metal alloy coating gold palladium,n trap stone entrapment and extraction device,urethral access sheath 9 point 5 fr 45 cm,ureteral access sheath 9 point 5 fr 35 cm,urostomy kit 60 mm with base plate elastic adhesive with fit technology 10 pc,urostomy kit 50 mm with base plate elastic adhesive with fit technology 10 pc,prostatic uretheral lift system,disposable hf cable 4m cat no wa00013a olympus,radiation protection cap embedded in a surgical cap,folleys baloon catheter 2 way silicon 14 fr,catheter nelaton 14,catheter nelaton 16,catheter nelaton 18,ureteral dilator sets and dilators polyeth

Urinary leg bag 540 ml,guide wire nitinol core angeled tip point 038 x 150 cm,endopath tri star surgical trocar 5 mm with safety shield,hydrophilic coated guide wires suitable for negotiating tortuous,hydrophilic coated guide wires suitable for negotiating tortuous,hydrophilic coated guide wires suitable for negotiating tortuous,bip foley catheter noble metal alloy coating gold palladium,bip foley catheter noble metal alloy coating gold palladium,n trap stone entrapment and extraction device,urethral access sheath 9 point 5 fr 45 cm,ureteral access sheath 9 point 5 fr 35 cm,urostomy kit 60 mm with base plate elastic adhesive with fit technology 10 pc,urostomy kit 50 mm with base plate elastic adhesive with fit technology 10 pc,prostatic uretheral lift system,disposable hf cable 4m cat no wa00013a olympus,radiation protection cap embedded in a surgical cap,folleys baloon catheter 2 way silicon 14 fr,catheter nelaton 14,catheter nelaton 16,catheter nelaton 18,ureteral dilator sets and dilators polyeth

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Atmospheric plasma coating system

Atmospheric plasma coating system

Read more
Plasma coating equipment power source upgradation

Plasma coating equipment power source upgradation

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise