Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Improvememnt Of Black Spot Near Yadwindra Enclave On Patiala Nabha Malerkotla Road (Mdr 32)
|
Description |
Improvememnt Of Black Spot Near Yadwindra Enclave On Patiala Nabha Malerkotla Road (Mdr 32)
|
Organisation | CE-PWD(B and R) | State Govt. and UT |
Tender Id | 2025_CEPW_140938_1 |
Reference Number |
Tender Notice No. 11 Dated 21.05.2025/1 |
Tender Fee | 3007 |
EMD | 17200 |
Tender Value | |
Place | Patiala |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=285613 |
Start Date | May 21, 2025 23:00 |
End Date |
29/05/2025 ( Expired 40 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provn of black top access road near shelter no 843 and behind shelter no. 829 and black top access road with culvert near stn alfa mess under ge panagarh
Provn of black top access road near shelter no 843 and behind shelter no. 829 and black top access road with culvert near stn alfa mess under ge panagarh
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreFor modernization of of link road sabgrur road mehmadpur to nabha via barsat souja rahit basta in mc patiala with 5 year maintenance mc patiala under special assistance tostate for capital investment 202526 600 crore project distt patiala group no.
For modernization of of link road sabgrur road mehmadpur to nabha via barsat souja rahit basta in mc patiala with 5 year maintenance mc patiala under special assistance tostate for capital investment 202526 600 crore project distt patiala group no.
Read moreConstruction work of damaged drain by rcc on left side of road from ambedkar square to meghdoot culvert via reserve police line gate no. 01 in ward no. 32.
Construction work of damaged drain by rcc on left side of road from ambedkar square to meghdoot culvert via reserve police line gate no. 01 in ward no. 32.
Read moreSpecial repair to nabha bir dosanjah road odr059 l-5.95 km under head-5054 rb-10 in distt patiala including maintenance of road for five year one year defect liability period and four year maintenance period
Special repair to nabha bir dosanjah road odr059 l-5.95 km under head-5054 rb-10 in distt patiala including maintenance of road for five year one year defect liability period and four year maintenance period&#x0d
Read moreConstruction work of interlocking side track from near garh walon ke bagh to mandi road in mohalla lohia nagar (on dhanora road).
Construction work of interlocking side track from near garh walon ke bagh to mandi road in mohalla lohia nagar (on dhanora road).
Read moreConstruction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe
Construction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe
Read moreMaintenance of agartala town road during the year 2025 26 construction of rcc cross drainage structure on pragati road near cake buffet sh rcc work and other allied items
Maintenance of agartala town road during the year 2025 26 construction of rcc cross drainage structure on pragati road near cake buffet sh rcc work and other allied items
Read moreConstruction of cc road near brahamputra enclave sec- 01, r.g.n scheme bareilly
Construction of cc road near brahamputra enclave sec- 01, r.g.n scheme bareilly
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreof your Industry type