Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Battery Energy Storage System Package Bess 03 Kalikiri, Andhra Pradesh
|
| Description |
Battery Energy Storage System Package Bess 03 For Setting Up Of 150 Mw/ 300 M Wh Battery Energy Storage System At Kalikiri, Andhra Pradesh Associated With Setting Up Of 1,000 Mw/ 2,000 M Wh Battery Energy Storage System (Bess) In Andhra Pradesh Under Tariff Based Competitive Bidding With Viability Gap Funding Supported Through Psdf.
|
| Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
| Tender Id | 26653 |
|
Reference Number |
CC/T/W-MISC/DOM/A10/25/15270 |
| Tender Fee | 25000 |
| EMD | 0 |
| Tender Value | - |
| Place | Kalikiri, Andhra Pradesh |
| Link |
View Original Tender Notice
https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=16e105d4-779b-480b-94ac-4df9d8596532 |
| Start Date | November 18, 2025 04:30 |
| End Date |
Expired
24/11/2025
Expired 324 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Package ts-bess-01 for setting up of 187.5 mw / 750 mwh (187.5 mw x 4 hrs) battery energy storage system(bess) in telangana
Package ts-bess-01 for setting up of 187.5 mw / 750 mwh (187.5 mw x 4 hrs) battery energy storage system(bess) in telangana
Read moreDesign, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited
Design, supply, testing, installation and commissioning of 20 mwh/ 10 mw grid connected battery energy storage system (bess) in cochin shipyard limited
Read moreEpc package for bess (400mwh) implementation at ntpc mouda-bidding doc no cs-9575- 171c-9
Epc package for bess (400mwh) implementation at ntpc mouda-bidding doc no cs-9575- 171c-9
Read moreNit for consultancy firm for feasibility study for bess and dpr for battery bank system for ktps
Nit for consultancy firm for feasibility study for bess and dpr for battery bank system for ktps
Read moreSelection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Read moreProcessor,memory,storage,display,battery life
Processor,memory,storage,display,battery life
Read moreDevelopment, operation and maintenance of 1000 mw (ac) ground mounted solar pv projects integrated with 2000 mwh (2-hour) battery energy storage system (bess) in the state of karnataka through tariff based competitive bidding with applicable e-reverse auction
Development, operation and maintenance of 1000 mw (ac) ground mounted solar pv projects integrated with 2000 mwh (2-hour) battery energy storage system (bess) in the state of karnataka through tariff based competitive bidding with applicable e-reverse auction
Read moreof your Industry type