Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Nalco Office Building Construction Opportunity 🏢 National Aluminium Company Limited (Nalco), A Central Government Ministry/Department, Is Seeking To Appoint A Competent Agency For The Construction Of Its New Office Building At Kharghar, Navi Mumbai, Maharashtra, Under A Lump Sum Engineering, Procurement, And Construction (Epc) Contract. 📅 Bid Submission Deadline: May 02, 2024, 4:00 Pm A Tender Security Amount Of Inr 20,92,000/ Is Required With The Eo I (Expression Of Interest). Interested Agencies Must Possess The Requisite Expertise And Experience In Construction Projects Of Similar Magnitude And Complexity. Proposals Should Encompass Detailed Project Planning, Cost Estimates, Construction Timelines, And Compliance With All Relevant Construction Regulations. Keywords: Nalco, Office Building Construction, Epc Contract, Central Government, Tender Security, Expression Of Interest, Construction Project, Maharashtra| Particulars | Details |
|---|---|
| Title |
Appointment Of Agency For Construction Of Nalco Office Buliding At Kharghar, Mumbai In Lump Sum Epc Mode
|
| Description |
Appointment Of Agency For Construction Of Nalco Office Buliding At Kharghar, Mumbai In Lump Sum Epc Mode
|
| Organisation | National Aluminium Company Limited,NALCO | Central Govt. Ministry/Department |
| Tender Id | 2024_NALCO_802183_1 |
|
Reference Number |
NALCO/CORP/PnT/CONT/2024/024 |
| Tender Fee | 0 |
| EMD | 20.92 Lakh |
| Tender Value | - |
| Place | Kharghar, Navi Mumbai,Maharastra |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=843224 |
| Start Date | May 31, 2024 14:30 |
| End Date |
Expired
12/08/2024
Expired 792 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
White topping of existing internal road of dhule city length 8 00 km bypassed section of nh 53 in the state of maharashtra on epc mode
White topping of existing internal road of dhule city length 8 00 km bypassed section of nh 53 in the state of maharashtra on epc mode
Read moreWidening to 4l ps configuration from km 6.600 to 16.300 of the khamgaon to shegaon section of n h 548c in the state of maharashtra on epc mode
Widening to 4l ps configuration from km 6.600 to 16.300 of the khamgaon to shegaon section of n h 548c in the state of maharashtra on epc mode
Read moreConsultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreReconstruction of old narrow minor bridges at km 101 247 km 103 352 km 108 846 and km 118 101 on pune solapur section from km 40 000 to km 150 050 of nh 65 maharashtra on epc mode
Reconstruction of old narrow minor bridges at km 101 247 km 103 352 km 108 846 and km 118 101 on pune solapur section from km 40 000 to km 150 050 of nh 65 maharashtra on epc mode
Read moreConstruction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreUp gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Read moreHt line shifting work under risk and cost for rehabilitation and upgradation of pal phata phulambri khultabad section of 752h from km.137.758 to km.105.700 design ch. km. 46.440 to 78.358 in the state of maharashtra on epc mode.
Ht line shifting work under risk and cost for rehabilitation and upgradation of pal phata phulambri khultabad section of 752h from km.137.758 to km.105.700 design ch. km. 46.440 to 78.358 in the state of maharashtra on epc mode.
Read moreRisk and cost work for up gradation of paithan to shirur for section ch..00.00 to ch..55. 937 nh 752e to two lane with paved shoulders in the state of maharashtra on engineering, procurement and construction epc mode basis contract.
Risk and cost work for up gradation of paithan to shirur for section ch..00.00 to ch..55. 937 nh 752e to two lane with paved shoulders in the state of maharashtra on engineering, procurement and construction epc mode basis contract.
Read moreof your Industry type