Tender Details

Particulars Details
Title
Dismantling, Fabrication And Erection Of The Structural Steel On As And When And Where Required Basis For A Period Of Two Years At Khadia Chp Phase 1
Description
Dismantling, Fabrication And Erection Of The Structural Steel On As And When And Where Required Basis For A Period Of Two Years At Khadia Chp Phase 1
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_NCL_326664_1
Reference
Number
KHD/EM/E-Tender/24-25/485 Date 22.01.2025
Tender Fee 0
EMD 1.22 Lakh
Tender Value -
Place Khadia Project
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338599

Start Date January 24, 2025 23:30
End Date
Expired 08/02/2025

Expired 610 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.

Supply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.

Read more
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Read more
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Expression of interest (eoi) for empanelment of agency for providing skilled man power services as and when and where required with all equipments & machineries (outsourcing) for comprehensive repair, operation and maintenance of urban water supply scheme under ‘peyjal nischay yojana’ of nagar parishad, motipur.

Expression of interest (eoi) for empanelment of agency for providing skilled man power services as and when and where required with all equipments & machineries (outsourcing) for comprehensive repair, operation and maintenance of urban water supply scheme under ‘peyjal nischay yojana’ of nagar parishad, motipur.

Read more
Ktps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.

Ktps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.

Read more
Fabrication, erection, dismantling and painting works for restrengthening and structural safety in chp area

Fabrication, erection, dismantling and painting works for restrengthening and structural safety in chp area

Read more
Dismantling, fabrication and erection of canopy plates in gb-1 and gb-2 (as and when required) for 2 years in chp, bina project.

Dismantling, fabrication and erection of canopy plates in gb-1 and gb-2 (as and when required) for 2 years in chp, bina project.

Read more
Dismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)

Dismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)

Read more
Dismantling, fabrication and erection of structural in dcda acid plant.

Dismantling, fabrication and erection of structural in dcda acid plant.

Read more
Dismantling,part changing,checking,replacement, overhauling and re-erection of parts of gyratory crusher at chp,bina project as and when required for a period of two years

Dismantling,part changing,checking,replacement, overhauling and re-erection of parts of gyratory crusher at chp,bina project as and when required for a period of two years

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise