Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Fabrication And Erection Of The Structural Steel On As And When And Where Required Basis For A Period Of Two Years At Khadia Chp Phase 1
|
| Description |
Dismantling, Fabrication And Erection Of The Structural Steel On As And When And Where Required Basis For A Period Of Two Years At Khadia Chp Phase 1
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_326664_1 |
|
Reference Number |
KHD/EM/E-Tender/24-25/485 Date 22.01.2025 |
| Tender Fee | 0 |
| EMD | 1.22 Lakh |
| Tender Value | - |
| Place | Khadia Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338599 |
| Start Date | January 24, 2025 23:30 |
| End Date |
Expired
08/02/2025
Expired 610 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.
Supply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreExpression of interest (eoi) for empanelment of agency for providing skilled man power services as and when and where required with all equipments & machineries (outsourcing) for comprehensive repair, operation and maintenance of urban water supply scheme under ‘peyjal nischay yojana’ of nagar parishad, motipur.
Expression of interest (eoi) for empanelment of agency for providing skilled man power services as and when and where required with all equipments & machineries (outsourcing) for comprehensive repair, operation and maintenance of urban water supply scheme under ‘peyjal nischay yojana’ of nagar parishad, motipur.
Read moreKtps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.
Ktps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.
Read moreFabrication, erection, dismantling and painting works for restrengthening and structural safety in chp area
Fabrication, erection, dismantling and painting works for restrengthening and structural safety in chp area
Read moreDismantling, fabrication and erection of canopy plates in gb-1 and gb-2 (as and when required) for 2 years in chp, bina project.
Dismantling, fabrication and erection of canopy plates in gb-1 and gb-2 (as and when required) for 2 years in chp, bina project.
Read moreDismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)
Dismantling/ disassembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis for the period of 730 days (two years) in chp phase 1, khadia project (ncl)
Read moreDismantling, fabrication and erection of structural in dcda acid plant.
Dismantling, fabrication and erection of structural in dcda acid plant.
Read moreDismantling,part changing,checking,replacement, overhauling and re-erection of parts of gyratory crusher at chp,bina project as and when required for a period of two years
Dismantling,part changing,checking,replacement, overhauling and re-erection of parts of gyratory crusher at chp,bina project as and when required for a period of two years
Read moreof your Industry type