Tender Details

About Tender

🏭 Invitation For Bids: New Electricity Connection At Nivesh Mitra And Jhatpat Portal 🏠 Paschimanchal Vidyut Vitran Nigam Ltd., The State Government Undertaking, Invites Bids For The Release Of New Electrical Connections Of Various Categories At Nivesh Mitra And Jhatpat Portal Under The Full Deposit Scheme In Edsd 1st Shikarpur, Bulandshahr, Under Edd Iii. 📅 Bid Submission Deadline: April 9, 2024, 11:00 Am Tender Fee: Inr 1180 Emd: Inr 2000 Interested Bidders Are Requested To Submit Their Proposals In Accordance With The Guidelines Provided In The Tender Document, Ensuring All Terms And Conditions Are Met. Keywords: New Connection, Electricity, Paschimanchal Vidyut Vitran Nigam Ltd, Nivesh Mitra, Jhatpat Portal, Full Deposit Scheme, Edd Iii, Bulandshahr, Government Tender, Bid, Electrical Services
Particulars Details
Title
Release New Connection Of Different Category At Nivesh Mitra And Jhatpat Portal Under Full Deposit Scheme In Edsd 1 St Shikarpur Under Edd Iii Bulandshahr.
Description
Release New Connection Of Different Category At Nivesh Mitra And Jhatpat Portal Under Full Deposit Scheme In Edsd 1 St Shikarpur Under Edd Iii Bulandshahr.
Organisation Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT
Tender Id 2024_PVVNL_921057_1
Reference
Number
125/EDC-III/B/2023-2024
Tender Fee 1180
EMD 2000
Tender Value
Place BULANDSHAHR
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1590963
Start Date April 02, 2024 22:30
End Date

09/04/2024 ( Expired 436 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Construction of rrm protection wall at new tower no.: 04

Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge

Read more
Repair maintenance of internal wiring and connected miscellanies works of hq dgbr office and otm complex at hq dgbr seema sadak bhawan ring road delhi cantt in the area of 1353 ge 21 brtf under project shivalik in new delhi

Repair maintenance of internal wiring and connected miscellanies works of hq dgbr office and otm complex at hq dgbr seema sadak bhawan ring road delhi cantt in the area of 1353 ge 21 brtf under project shivalik in new delhi

Read more
Under iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme.

Under iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme. &amp#x0d &amp#x0d

Read more
Installation of new tubewell civil work and ohsr at bifurcation of water supply scheme wanchari mh from existing water supply scheme varpal block verka district amritsar under nabard xxx

Installation of new tubewell civil work and ohsr at bifurcation of water supply scheme wanchari mh from existing water supply scheme varpal block verka district amritsar under nabard xxx

Read more
Renovation of false ceiling in different areas under phase-ii in jcg and pcr science block at iit kharagpur.

Renovation of false ceiling in different areas under phase-ii in jcg and pcr science block at iit kharagpur.

Read more
Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.

Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.

Read more
Construction of road in connection with darrang at niz-mangalbeisa road under pwd, udalguri (r and b) division. (tn_81_1)

Construction of road in connection with darrang at niz-mangalbeisa road under pwd, udalguri (r and b) division under mudwibari constituency under sopd (g) for 2021-22 (part-i from ch. 0.00m to ch. 700.00m) and (part -ii from ch. 0.00m to ch. 600.00m)

Read more
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode

Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode

Read more
Providing and fixing ( in runnng mode, in all respect as per tender documents) of open garden gym (from 1 to 11 and ground swing) at distt. malerkotla under mp lad scheme.

Providing and fixing ( in runnng mode, in all respect as per tender documents) of open garden gym (from 1 to 11 and ground swing) at distt. malerkotla under mp lad scheme.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise