Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Collection Of Oil Sample From Nigahi Old Workshop, New Work Shop, Drill And Shovel Section To Cmc , Jayant And Report From Cmc To Nigahi Old Workshop, New Workshop And Shovel Section For One Year Excluding Sunday And Holidays At Nigahi Project.
|
Description |
Collection Of Oil Sample From Nigahi Old Workshop, New Work Shop, Drill And Shovel Section To Cmc , Jayant And Report From Cmc To Nigahi Old Workshop, New Workshop And Shovel Section For One Year Excluding Sunday And Holidays At Nigahi Project.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_NCL_316484_1 |
Reference Number |
NGH/EXCV/TENDERS/24-25/114 |
Tender Fee | 0 |
EMD | 2700 |
Tender Value | |
Place | NIGAHI PROJECT |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=327980 |
Start Date | September 03, 2024 15:00 |
End Date |
16/09/2024 ( Expired 287 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tn.no.04 2025-26 hdo nh dt.20.06.2025
Short term maintenance works stretches from km 167/600 to 187/600 and km 209/00 to 210/150 of new nh 85(old nh 49e) of madurai -cochin road for the year 2024-25
Read moreDifferent work to be performed for making water supply from distribution network for one year at site ward no. 63 and 64. file no. 149/25x9/1.
Different work to be performed for making water supply from distribution network for one year at site ward no. 63 and 64. file no. 149/25x9/1.
Read moreMaintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Maintenance work on up/haryana border -yamunanagar- saha-panchkula section of (old nh-73) (new nh-344) from km. 71.400 to km. 176.400 (package-1,2, 3) in the state of haryana and allied works on zirakpur-parwanoo section of nh-05.
Read moreSupply of manpower for operation of one no 10point 5cum stationary compactor suda supplied for swm under cmc for a year working days 6am to 2pm from the date of receiving work order along with one driver, one operator and one helper
Supply of manpower for operation of one no10point5cum stationary compactor suda supplied for swm under cmc for a year working days 6am to 2pm from the date of receiving work order along with one driver, one operator and one helper
Read moreAAAAAAAAAA
Login to viewCon of border security fencing from phase ii/iii to new design fence in west bengal between bp no. 243/mp to 764/2-s (length 210.028 km). sh- in various stretches from bp no. 355/2-s to 357/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km). (total length 27.447 km including intermediate bops reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along indo bangladesh border in the district of uttar dinajpur, west bengal. (package-v) in epc mode-iii. sw- providing services of watch ward for the cpwd office campus of border fencing division-ii, cpwd(ibbz-i), islampur.
Read moreAAAAAAAAAA
Login to viewConstruction of new stp of 500 kld for existing hostels new building along with sewer line connection unfiltered water line distribution and drain beside stadium i/c operation for 6 months at iim, bodhgaya sh c/o drain beside stadium and slope reversal of existing drain from old hostel no.-4 to auditorium sitc of submersible sewerage pump etc sw balance work
Read more09/nit/ee/bfd-ii/2025-26
Con of border security fencing from phase ii/iii to new design fence in west bengal between bp. no. 243/mp to 764/2-s (length 210.028 km) sh: between bp. no. 328/4-s to 332/7-s and 347/2-s to 355/2-s (27.709 km including intermediate bops, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc) along indo bangladesh border in the district of uttar dinajpur, west bengal. (package-iv) in epc mode-iii. sw: providing the services of watch ward and data entry operator for the o/o s, bfc-i o/o ce/ibbz-i, nirman bhawan, matigara, under ibbz-i, cpwd, siliguri, west bengal.
Read moreRepair, maintenance and changing work of 10 and 8 inch main supply line from intake riverside to settling tank at filter house and to settling tank at c and d colony for a period of one year (01 year) under kathara colliery, kathara area
Repair, maintenance and changing work of 10 and 8 inch main supply line from intake riverside to settling tank at filter house and to settling tank at c and d colony for a period of one year (01 year) under kathara colliery, kathara area
Read moreSupply of manpower for operation of one no 10 point 5cum stationary compactor for swm under cmc for a year or 365 working days 6am to 2pm from the date of receiving work order along with one driver one operator and one helper each required for cmc
Supply of manpower for operation of one no 10 point 5cum stationary compactor for swm under cmc for a year or 365 working days 6am to 2pm from the date of receiving work order along with one driver one operator and one helper each required for cmc
Read moreNiq no.08/eesm(c)-i/bgpd/2025-26
Construction of new stp of 500 kld for existing hostels, new building along with sewer line connection , unfiltered water line distribution and rain beside stadium including operation for 6 months at iim bodhgaya sh c o drain beside stadium and slope reversal of existing drain from old hostel no 4 to auditorium sitc of submersible sewerage pump etc sw balance work
Read moreof your Industry type