Tender Details

Particulars Details
Title
Pucca Drain With Cover At Barkolia Shuti Khal To Madrasha
Description
Pucca Drain With Cover At Barkolia Shuti Khal To Madrasha
Organisation Government of West Bengal
Tender Id 2023_ZPHD_569425_3
Reference
Number
WB/HOW/SHY-I/NIET-40/23
Tender Fee 250
EMD 2100
Tender Value -
Place OFFICE OF THE NABAGRAM GRAM PANCHAYAT
Link
View Original Tender Notice

https://wbtenders.gov.in

Start Date September 14, 2023 23:30
End Date
Expired 22/09/2023

Expired 1091 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Group no-02 construction of drain with cover from devi sthan to arun kumar's house in ward no. 7.

Group no-02 construction of drain with cover from devi sthan to arun kumar's house in ward no. 7.

Read more
Bt renewal to road from r and b road to laxmakkapeta and cc drain from r and b road to jinning mill towards laxmakkapeta at nayakulagudem in kothagudem corporation under nagarabruvrudhi

Bt renewal to road from r and b road to laxmakkapeta and cc drain from r and b road to jinning mill towards laxmakkapeta at nayakulagudem in kothagudem corporation under nagarabruvrudhi

Read more
Widening of exsisting cc road with bt layer from khammam road to shivalayam at sujathanagar in kothagudem corporation under ngb

Widening of exsisting cc road with bt layer from khammam road to shivalayam at sujathanagar in kothagudem corporation under ngb

Read more
Formation of gravel road with wmm from pakshi tirtham to sironcha bridge at kaleshwaram(v), mahadevpur(m), jayashankar bhupalpally district.

Formation of gravel road with wmm from pakshi tirtham to sironcha bridge at kaleshwaram(v), mahadevpur(m), jayashankar bhupalpally district.

Read more
Godavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district

Godavari pushkaralu 2027 construction of a cc road from main ghat to saraswathi ghat with central lighting at kaleshwaram (v) mahadevpur (m) jayashankar bhupalpally district

Read more
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)

Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)

Read more
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)

Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)

Read more
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house

Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house

Read more
Carry out routine maintenance with round the clock services for operation and maintenance of 33/11kv substation with connected distribution transformers and switchgear at head works and various intermediate pumping stations under srsp adilabad segment for the year 2026-27 for the period october 2026 to march 2027

Carry out routine maintenance with round the clock services for operation and maintenance of 33/11kv substation with connected distribution transformers and switchgear at head works and various intermediate pumping stations under srsp adilabad segment for the year 2026-27 for the period october 2026 to march 2027

Read more
Upgrdation of existing sas system schneider electric make pascis oi to latest sofware with replacemement of associated hardware i.e., cpu cards di and do cards in schneider electric make bcu and work stations (as per boq) at 220/132/33 kv kosigi ss in mahabubnagar circle.

Upgrdation of existing sas system schneider electric make pascis oi to latest sofware with replacemement of associated hardware i.e., cpu cards di and do cards in schneider electric make bcu and work stations (as per boq) at 220/132/33 kv kosigi ss in mahabubnagar circle.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise