Tender Details
Particulars | Details |
---|---|
Title |
Ttps Es Circle Em I Rewinding Of 0 40 K W 3 Phase 415 V Lt Exhaust Fan Motor Released From 6 6k V Swgr Control Room And Rewinding Of Failed Control Transformer 415 V 110 V Released From Various Lt Modules Of Unit I Ii And Iii
|
Description |
Ttps Es Circle Em I Rewinding Of 0 40 K W 3 Phase 415 V Lt Exhaust Fan Motor Released From 6 6k V Swgr Control Room And Rewinding Of Failed Control Transformer 415 V 110 V Released From Various Lt Modules Of Unit I Ii And Iii
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_463554_1 |
Reference Number |
CE/SE/ES /TTPS /No.211/2024-25 |
Tender Fee | 0 |
EMD | 100 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=550926 |
Start Date | July 17, 2024 14:30 |
End Date |
31/07/2024 ( Expired 309 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps operation circle cad annual maintenance of unit i lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 2000kva, acwph service transformer i during the forth coming annual overhaul period 2025 to 2026 in acwph
Ttps operation circle cad annual maintenance of unit i lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 2000kva, acwph service transformer i during the forth coming annual overhaul period 2025 to 2026 in acwph
Read moreTtps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2025 to 2026 in acwph
Ttps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2025 to 2026 in acwph
Read moreTtps- echp-i-dismantling and rewinding of failed 3 phase ac 415v 7.5kw induction motor of 10t electrical hoist e4 at secondary crusher house-i
Ttps- echp-i-dismantling and rewinding of failed 3 phase ac 415v 7.5kw induction motor of 10t electrical hoist e4 at secondary crusher house-i
Read moreTtps es circle em i rewinding of 5 nos lt 3 phase 415v 1 2kw cooler fan motors of single phase generator transformer at unit iii
Ttps es circle em i rewinding of 5 nos lt 3 phase 415v 1 2kw cooler fan motors of single phase generator transformer at unit iii
Read moreTtps es circle em i loading and transporting of 30 nos new transformer oil barrels from central stores ttps and unloading at unit i generator transformer yard and preheat oil circulation for emergency use to generator transformers power transformers
Ttps es circle em i loading and transporting of 30 nos new transformer oil barrels from central stores ttps and unloading at unit i generator transformer yard and preheat oil circulation for emergency use to generator transformers power transformers
Read moreTtps es circle em ii complete servicing and defect rectification of 5 nos 500v 3200 amps l t make air circuit breakers and rewinding of mv 1 coils in esp ahp stage i ii and clwph lt swgrs
Ttps es circle em ii complete servicing and defect rectification of 5 nos 500v 3200 amps l t make air circuit breakers and rewinding of mv 1 coils in esp ahp stage i ii and clwph lt swgrs
Read moreTtps es circle em ii new proposal for erection and commissioning of spare hpwp motor 260kw 6 6kv 1486 rpm sl no 3810104 3 make kirlosker electric ltd at ahp stage i
Ttps es circle em ii new proposal for erection and commissioning of spare hpwp motor 260kw 6 6kv 1486 rpm sl no 3810104 3 make kirlosker electric ltd at ahp stage i
Read moreSp.106 nctps ii es circle em ii dn sdnii routine running maintenance of lighting in unit i and ii boiler transformer yard tg building id fan area esp area, chimney and service building from 01 04 2025 or from the date of taking over of the si
Sp.106 nctps ii es circle em ii dn sdnii routine running maintenance of lighting in unit i and ii boiler transformer yard tg building id fan area esp area, chimney and service building from 01 04 2025 or from the date of taking over of the si
Read moreTtps es circle em iii load testing of 4 nos 10 tonne capacity wire rope electric hoists at fd fan and pa fan motor 5a and 5b of unit 5 boiler area
Ttps es circle em iii load testing of 4 nos 10 tonne capacity wire rope electric hoists at fd fan and pa fan motor 5a and 5b of unit 5 boiler area
Read moreTtps mech ii bm unit i ii iii attending breakdown maintenance works in id fd pa fan motor lube oil system forced lube oil system bearing cooling water system and control oil system in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit i ii iii attending breakdown maintenance works in id fd pa fan motor lube oil system forced lube oil system bearing cooling water system and control oil system in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreof your Industry type