Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Govt.Emplyee Quarter At Sapi Shargole By Way Of Plinth Protection Compound Walling And Panelling / Finishing Works .
|
Description |
Construction Of Govt.Emplyee Quarter At Sapi Shargole By Way Of Plinth Protection Compound Walling And Panelling / Finishing Works .
|
Organisation | Union Territory of Ladakh |
Tender Id | 2023_PWD_10417_6 |
Reference Number |
E-tendder 31 of PW(RnB) Div Kargil 2023-24 |
Tender Fee | 1000 |
EMD | 1.06 Lakh |
Tender Value | |
Place | EE PW(RnB) Div Kargil |
Link | https://tenders.ladakh.gov.in |
Start Date | July 22, 2023 23:30 |
End Date |
31/07/2023 ( Expired 690 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fleet base buildings landside works (fbl)
Fleet base buildings landside works
 (fbl) - construction of fleet base
 buildings and infrastructure,
 equipment supply, installation,
 commissioning, operation and
 maintenance of landside facilities
 at naval base, karwar, karnataka
Read moreDockyard works (dy)
Dockyard works - construction of
 dockyard buildings and
 infrastructure, equipment supply,
 installation, commissioning,
 operation and maintenance of
 facilities at naval base, karwar,
 karnataka
Read moreFleet base buildings waterfront works (fbw)
Fleet base buildings
 waterfront works(fbw) -
 construction of fleet base
 buildings and infrastructure,
 equipment supply,
 installation, commissioning,
 operation and maintenance of
 waterfront facilities at naval
 base, karwar, karnataka
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreRedevelopment of kamathipura cluster lane 1 to 15, kamathipura, mumbai, through a construction- cum development contract by appointment of c and da
Redevelopment of kamathipura cluster lane 1 to 15, kamathipura, mumbai, through a construction- cum development contract by appointment of c and da
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreof your Industry type