Tender Details
Particulars | Details |
---|---|
Title |
Hubballi Division: Bannikoppa Raising And Extension Of Platform To Make It High Level Of 560m Length With Cement Concrete Flooring At Bannikoppa (Bna) Station.(Maintenance Period=03 Months)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76083552 |
Reference Number |
18UBL24-25DT110724ITEM-05 |
Tender Fee | 0 |
EMD | 2.3 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76083552/viewNitPdf_4632362.pdf |
Start Date | July 16, 2024 23:45 |
End Date |
09/08/2024 ( Expired 277 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - iv).
Construction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - iv).
Read moreConstruction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - v).
Construction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - v).
Read moreConstruction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - iii).
Construction of 03(three) nos. sbdtw by mini rig 01(one) no sbdtw by manual means including extension of pipeline, fhtc with post and platform under jjm at different locations under mungiakami dws sub-division (group no - iii).
Read moreAnnual maintenance of 1 no. schindler make lift installed at high court extension block a, sector 17, chandigarh (during the period of 2025 2026).
&#x0d annual maintenance of 1 no. schindler make lift installed at high court extension block a, sector 17, chandigarh (during the period of 2025 2026).
Read moreExtension of temporary supply for ht cat-vii for cmd of 500 kva with cl 500kw load to the indian navy vlf station at damagundundam vg in manneguda section of vikarabad sub division
Estimate for extension of temporary supply for ht cat-vii for cmd of 500kva with cl 500kw load to the indian navyvlf station at damagundam(vg), pudur(m) of manneguda section of vikarabad sub-division of vikarabad divisionunder temporary contribution works.
Read moreOperation and maintenance of sewage pumping station no.-sps-i panchayat bawadi thakurli (e) sps-ii ayare road dombivli (e) in three shift at dombivli division with required spares for the period of two years.
Operation and maintenance of sewage pumping station no.-sps-i panchayat bawadi thakurli (e) sps-ii ayare road dombivli (e) in three shift at dombivli division with required spares for the period of two years.
Read moreOperation maintenance and watch and ward of toilet at sukhna lake regulatory end under the sde water supply sub division no. 2 chandigarh (period 01.05.2025 to 31.10.2025) (06 months) (ch. to 2216 (np) mtc. and repair
Operation maintenance and watch and ward of toilet at sukhna lake regulatory end under the sde water supply sub division no. 2 chandigarh (period 01.05.2025 to 31.10.2025) (06 months) (ch. to 2216 (np) mtc. and repair
Read moreMaintenance of multi layer avenue plantation (mlap) from shamshabad to gaganpahad sub station in ward no-59, mylardevpally division, circle-xi, rajendranagar circle, charminar zone, ubd, ghmc for the the year 2024-25 for 12 months (total length 5km)
Maintenance of multi layer avenue plantation (mlap) from shamshabad to gaganpahad sub station in ward no-59, mylardevpally division, circle-xi, rajendranagar, charminar zone, ubd, ghmc for the year 2024-25 for 12 months (total length-5km)
Read moreOperation maintenance and watch and ward of toilet at sukhna lake regulatory end under the sde water supply sub division no. 2 chandigarh (period 01.05.2025 to 31.10.2025) (06 months) (ch. to 2216 (np) mtc. and repair
Operation maintenance and watch and ward of toilet at sukhna lake regulatory end under the sde water supply sub division no. 2 chandigarh (period 01.05.2025 to 31.10.2025) (06 months) (ch. to 2216 (np) mtc. and repair
Read moreComprehensive servicing and maintenance of 13 nos escon make lifts installed at various municipal premises andhospitals for period of 24 months from 01 05 2025 to 30 04 2027
Comprehensive servicing and maintenance of 13 nos escon make lifts installed at various municipal premises andhospitals for period of 24 months from 01 05 2025 to 30 04 2027
Read moreof your Industry type